Loading...
Town Center L3B3-CS010907 (2) T H E: C: I T Y 0 COFFELL September 7, 2001 Bruce Dunne Welch Engineering, Inc. F:II..E 4109 Cagle Drive, Suite D North Richland Hills, TX 76180 RE: Town Center Addition, Lot 3, Block 3 (First American Bank) Fee Assessment Letter Dear Mr. Dunne: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $6.750.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely,/~ Kenneth M. Griffin, P.E. Director of Engineering/Public Works cc: Jennifer Armstrong, Finance Director Rhonda Brothers, Secretary. Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official GAD." Sims, Director of Leisure Services D VELOPMENT FEE TABLI Project: Town Center Addition, Lot 3, Block 3 (First American Bank) Date: 9/6/2001 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $137.81 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,220.12 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/lZireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $9,452.93 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,750.00 DEVELOPMENT FEE WORKSHEET PROJECT: Town Center Addition, Lot 3, Block 3 (First American Bank) DATE: 9/6/2001 Water Impact Fee: Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's Fireline Meter(s): 1 - 8 inch = 2.5 ESU's Total #: 10 ESU's @ $450.00 ea. $4,500.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $137.81 $137.81 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $62.74 $62.74 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 1 Fireline Meter(s) @ $2,157.38 $2,157.38 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. $3500 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 @ $450.00 ea. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: 2 Single-family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway' Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROAD WAY IMPACT FEE CALCULA'I'iONS PROJECT: Town Center Addition, Lot 3, Block 3 (First American Bank) DATE: 9/6/2001 ROADWAY IMPACT FEE: Service Area * 2 Category ** Commercial Land Use ** Bank Building Area (sf) 4,995 Development Units ** 5.00 Vehicle Miles per Development Unit ** 2.11 Fee per Vehicle Mile *** $300 Road~vay Impact Fee due = (Development Units) x I(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $3,161.84 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Road~vay Impact Fee Study) As per the 1982 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore no Roadway Impact Fee will be collected on this project. ~ AMOUNTDUE: $0.00