Loading...
Town Oaks Center-LR 840928 D-FW Engineering & Testing, Inc. PO Box 1247o £uless Texas 76G39 ]247 Phone 8 t 7 540 2622 CONCRETE TEST CYLINDER REPORT CLIt~4T: Minvards/Univest (JV) JOB NO.: 84-1273/ 1274 PROJECt: Townoaks Centre/Retail Shell CYLINDER DATE AGE SLL~P, TOTAL CC~RESSIVE IDENTIFICATION LOCATION bgXDE DAYS INCHES LOAD,LBS. STR~,psi 1-D Pour #2 8-31 28 5¼" 124,200 4393 ]-E Pour #2 8-3] 28 5¼" ]23,900 4383 2-D Pour #2 8-31 28 5½" 107,200 3792 2-E Pour #2 8-31 28 5½" 108,300 3831 CYLINDERS MADE BY: D-FW ENGINEERING & TESTING, INC. SPECIFICATIONS: 3500 PSI @ 28 Days Date of Break: 9-28-84 D-FW Engineering & Testing, /nc.