Loading...
ST9801-CS 990924Sent ~y: FREESE & NICHOLS FREESE - NICHOLS 2149202565 Post-it' Fax Not(~ '7671 Phone # Meeting Minutes Project: Subject: Recorded by: Date: l,ocation: AItendees: Coppell Road Improvements Project #ST98-01 Construction Meeting Keyin Young September 22, 1999 City of Coppell Town Hall Larry Davis, Kent Collins, .Mike 'Martin, Robert Weber, Gary Pryor, Bobby Inmon, Keyin Young The following is our understanding of the subject matter covered during the subject meeting. If this )differs from your understanding, please notify us within five working days. P.~,ct [s sue.S: Bobby lnmon indicated that utility poles have been, or are presently being, relocated to avoid construction. Ed Bell wants to begin with the multi-box culvert and the City concurs, if traffic issues can be worked out. Other utility conflicts include gas line relocation to eight feet below the existing ditch grille at the culvert location. Mr. Inmon confirmed that this has been done. The City has TxDOT permits available in their office. Kern Collins has begun marking trees along the east-west portion for removal. The City will continue these eftbrts on Friday, 9/24 at 2:00 PM. Trees to be removed will be marked with an orange "X". Letters to residents will be sent out by the City to give them ;m oplx~rtunity to provide input regarding the marked trees. Once marked, Ed Bell needs two weeks to coordinate tree toppers/:'or the tree removal. SurVey control has been established. This should be finished on 9/22. PVC supply is still the only material avaiability problem, according to Ed Bell. *Bell will provide the City with written intbrmation including 3 suppliers and their PVC availability. *Bell will contact the Home Owners' Association to establish an early relationship. There are 4 R,tEESE AN[) NICII OLq * t 341 W. MOCKINGBIRD LANE, SUITE 230.-E · DALLAS, TEXAS 75247-.4922 TELEPHONE: 2 14-920-2500 · FAX: 214-920-2565 · F'C)RM DAI'I:~: Sent by: FREESE & N:]:CHOLS 2149202565 09/23/99 12:50PM Job 378 Page 3/3 Meeting Minutes Coppell Road Improvements ST98-01 September 22, t 999 Page 2 .~/~to 5 HOA' s, according to Mr. Collide. Bell has had no contact with the property owners, but plans on placing the batch plant on one of the adjacent properties. Bell is aware that a TxDOT permiXwill be needed for this activity. "d (..~. *Regarding work phasing, the City needs specifics in writing from Ed Bell pertaining to traffic flow and scheduling. Before ro~KI closures can occur, City internal eftbrts would need totReplace in the way of ~ouncil approval. /(. There are no changes to the project schedule. ] Work expected in the next month includes tree marking and removal, fence relocations and properly owner contacts by Ed Bell, utility relocations, and box culvert construction, if appn'~ved by City. ~. Ed Bell ~md Coppell Construction wish to construct the box culvert, as soon as possible. *Ed Bell will establish in writing how this activity will occur. ~ Traffic is a large City and resident concern with this project. GTE, the apartment complex, severM subdivisions, sanitation trucks, school buses, and emergency vehicles use this road regularly. Accessibility is a sensitive issue. ~e~o~C.~do~ur.e olill hav~ 't'o be 'tatt-d byrG~o~ci/o t.~. Traffic plans will have to be approved by City, . A major sel ling point v,~ be ease and speed in construction. /ff'g. *Bell will provide the City with traffic options for their review. IH F~ }tb'Nilef w ttVl#l,, v/. The City urges Bell to consider precast boxes across the roadway, to hasten construction. Upcoming Calendar Events kS. 'Di.~ f..Xtj i:: pl~nnitN3 ~,,~ ,~orktn~ on t .....b,,., L~,ty. {//~ Notice to proceed' will be 9t22/99, anti the official start date will be 10/4/99. *Action Items END - FREESE AND NICHOt.21 · 1341 W. MOCKINGBIRD LANE, SUITE 230-E · DALLAS, TEXAS 75247-4922 TEI,EPHONE: 214-920-2500 · FAX: 214-020-2565 ® FORM DATE: 9/3f97 Sent,by: FREESE & NICHOLS 2149202565 21,~2565 09/23/99 I~""~gPM Job 378 Page 1 1341 W, Mockingbird Lane, Suite 230-E, Dallas, Texas 75247-4922 214/920-2500 · FAX214/920-2565 · www.freese.com FREESE - NICHOLS Architecture FAX T.RANSMITTAL SHEET Aviation To: Construction Mvalagement Danis & Spillways Fax No.: Drainage From: Electrical Engineering Environmental Science Fire Protection Flood Management Levees & Canals Mechanical Engineering Comments: Pipeline Design Plumbing Design Pump Station Design Remediarion Site Development S~reets & Highways Structural Engineering Telecommunications q 7~. 3o,--f - s Date: c~ / Z 3 /~ ~ Total number of pages, including transmitt,'d sheet: Charge: C7 ,o t. 4' ~/~ ,--r ~ Utilities Solid Waste Facilities Water Restmrce Planning Water 'Transntission Systems If there is a problem receiving any pages. please call Kathryn at 214/920-2500. :T !'