Loading...
Townhouses-CS011106 DATE: ,,/(~/~, RE: J""'"~~ 0~~ TO: .... . SIGNED: ~ ' , TOP9 FOflM 4150 L LEASE REPLY ~ NO REPI" DEVELOPMENT FEES PRO.1ECT NAME: Townhouses of Coppell ENGINEER: ORIGINATION DATE: 10/12/00 SENT ASSESSMENT ASSESSED FEE AMOUNT PA/D DATE 10/12/00 Park Fee $118,220.00 $118,220.00 10/16/00 10/12/00 Water Impact Fee $50,175.00 $50,175.00 10/16/00 10/12/00 Wastewater Impact Fee $41,850.00 $41,850.00 10/16/00 8/27/01 Street Sign $603.34 $603.34 9/21/01 8/27/01 Street Ught $2,640.60 $2,640.60 9/21/01 2%4% Construction Inspection $35,364.00 $35,364.00 10/23/00 10/12/00 Roadway Impact-Zone $55,476.00 $55,476.00 10/16/00 Street Cut Permit 2/8/01 Overtime Ins ~-~:tion $240.00 $240.00 2/23/01 3/19/01 Overtime Ins ~-t. ion $240.00 $240.00 4/3/01 5/7/01 Overtime Ins ~:tion $120.00 $120.00 8/14/01 5/14/01 Overtime Ins ~:tion $160.00 $160.00 8/14/01 5/21/01 Overtime Ins :ection $240.00 $240.00 6/5/01 6/4/01 Overtime Ins ~:tion $200.00 $200.00 6/13/01 7/9/01 Overtime Ins :ection $160.00 $160.00 7/31/01 Water Tap Inspection $4,800.00 $50.00 4/6/01 Wastewater Tap Inspection $4,650.00 ?IE'~POA/~I~/)/~ I~I-lU7"It55 ~ Water Meter (Domestic) $2,471.01 S//~ ~o~iO 7'0 [~. ~N$ P.. Water Meter (Fire/Irdg) $2,536.12 ~ $2,157.38 4/6/01 Meter Deposit (Domestic) $3,255.00 _~///g P,~lO ~ ~.~NsP. Heter Deposit (Fire/Irrig) $90.00 $30.00 4/6/01 Utility Final Inspection $4,650.00 S/l~ ~)IP ~ ~.~VS~. Total Fees' Fees Paid Amount Owed TOTALS $328,141.07 $307,926.32 $20,214.75 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Erosion Control Maint.