Loading...
Townhouses-CS010828 T H E ¢ I 1' Y 0 F COFFELL August 28, 2001 Craig Lemp C.N. Lemp Development, Inc. 4101 McEwen, Suite 110 Dallas, TX 75244 Fax 972-404-1833 RE: Townhouses of Coppell Dear Mr. Lemp: Please be advised that a walk-through has been scheduled for Thursday, August 30, 2001 at 8:00 a.m. for the drainage facilities in the referenced project. I have also been advised that the water and sewer facilities are ready for a follow-up walk-through at this time. Please ensure that all facilities are clean and accessible at the scheduled time and that contractors representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972/304-3685 at your earliest convenience. Construction Inspector cc: Mike Boney, Site Concrete, Inc. fax 972/513-0661 Mike Daniel, Nathan D. Maier fax 214/739-5961 Ken Griffin, Director of Engineering/Public Works Glenn Hollowell, Asst. Dir. of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal .................................... 2.55 PAR~.',NAY * P O BOX 478 *' COPPELL TX 7§019 1Ir TEL 972/462 0022 lk' FAX 972/304 3673