Loading...
Townhouses-CS010814 T H E: C I T Y O F COPPELL August 14, 2001 To Co./Dept. Phone # Craig Lemp C.N. Lemp Development, Inc. F~'qTZ 4101 McEwen, Suite 110 Dall~, TX 752~ F~ 972~04-1833 RE: Townhouses of Coppell Dear Mr. Lemp: Please be advised that a walk-through has been scheduled for Thursday, August 16, 2001 at 8:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-3685 at your earliest convenience. 7671 Date ~//~/~ P~a~tes Post-it* Fax Note Sincerely, x. ~l/~t~- ,~0/6~/~// Fromm, ~p ~ Construction Inspector Fax~7 2.. ~/3 0 6 6 / Fax, cc: Mike Boney, Site Concrete, Inc. fax 972-513-0661 Rick VanGuilder, Site Concrete, Inc. Mike Daniel, Nathan D. Maier fax 214-739-5961 Ken Griffin, City Engineer Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Post-iPFax Note 7671 Datg/ii.~/(~Ipages-I#°f · I T° ]'}1 t l/'-~' P,q~l Co,l~ept.N l~j~ Co. Phone# Ph°n~"7 ~ ,.~ 0 L~' ................... 2i 255 ~.E,<.',NAV ~ P 0 BOX 478 t C. OPPELL TX 75019