Townhouses-CS010814 T H E: C I T Y O F
COPPELL
August 14, 2001 To
Co./Dept.
Phone #
Craig Lemp
C.N. Lemp Development, Inc. F~'qTZ
4101 McEwen, Suite 110
Dall~, TX 752~ F~ 972~04-1833
RE: Townhouses of Coppell
Dear Mr. Lemp:
Please be advised that a walk-through has been scheduled for Thursday, August 16, 2001 at
8:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-304-3685 at your earliest convenience.
7671 Date ~//~/~ P~a~tes
Post-it* Fax Note
Sincerely, x. ~l/~t~- ,~0/6~/~// Fromm, ~p ~
Construction Inspector Fax~7 2.. ~/3 0 6 6 / Fax,
cc: Mike Boney, Site Concrete, Inc. fax 972-513-0661
Rick VanGuilder, Site Concrete, Inc.
Mike Daniel, Nathan D. Maier fax 214-739-5961
Ken Griffin, City Engineer
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Post-iPFax Note 7671 Datg/ii.~/(~Ipages-I#°f · I
T° ]'}1 t l/'-~' P,q~l
Co,l~ept.N l~j~ Co.
Phone# Ph°n~"7 ~ ,.~ 0 L~'
................... 2i
255 ~.E,<.',NAV ~ P 0 BOX 478 t C. OPPELL TX 75019