Loading...
Townhouses-CS010514 T H E: C I T Y 0 F COPPELL May 14, 2001 Mike Boney Site Concrete, Inc. PO Box 154489 Irving, TX 75015-4489 RE: To,ax~houses of Coppell Dear Mr. Boney: inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, May 12, 2001. The overtime rate including salary and benefits is $40.00 per hour. The minimum four hours were charged to your company on that date. Please send a copy of this letter along with your check for $160.00, payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director i-'if you should have any questions, please contact me at (972) 304-3679. Sincerely, Construction Inspector Rhonda Brothers, Engineering Secretary ;;'55 PARKWAY 'A' P.O BOX 47B dr COPPIELI_ TX 75019 dr TEL 972/462 0022 dr FAX 972/304 367,3 ~}l~la~~~L~q~, inspection service was provided by the CiD' of Coppe-H Eng'meering Department at the referenced location on Saturday, ~ The overtime rate including salary and benefits is $~i:~r ~o;~r. ~ ~,~(~xii~ ~ ~ hours were charged to your company ~n that date. Please send a check for $ ~ ~ O .00 payable to the City of Coppell to the following address: City of Coppell Fire. ce Depanmem P.O. Box 478 Coppell, TX 75019 Attention: ~Ala~ Jolm~, .Finznee Dir~tor If' you should have any qu~tiom, plea..~ contact me at (214) 304-3685. Sincerely, Garreth D. Campbell Construction Inspector cc: Finance Department file./ovt, ltr