Loading...
Townhouses-CS010319 T H E C I '1' Y 0 F COl'FELt FL March 19, 2001 Mike Boney Site Concrete, Inc. P.O. Box 154489 Irving, Texas 75015-4489 RE: Townhouses of Coppell Dear Mr. Boney: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturdas, March 17, 2001. The overtime rate including salary and benefits is S40.00 per hour. Six hours were charged to your company on that date. Please send a copy of this letter along with your check for $240.00, payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 3C4-3679. Sincerely, Construction Inspector cc: Finance Department Rhonda Brothers, Engineering Secretary 255 ~ARK~%'~' ~lr P O E~OX 478 ~k COP~ELL TX 75OI9 ~lr TEL ~7214~22 0022 ~ FAX 972.'304 3~73