Loading...
Townhouses-CS00120701 MCE~F_24 # 110, DAI_J..AS, TX 7524.4 (972) 755-1085 FAX# (972) 404-18:8:8 1~002 Di~tember 7, 2000 Mike Dani~ N~then D. Meier Consultinl~ Engineer~. Inc. Two North~ark i $080 Park Lane, Suite 600 Dallas. Texas 75231 Re: Townhouses of Coppelt Dear Mr. Dan,eh i In response to your Octob~ 24, 2000 letter, Dallas Water Utilities has reviewed (he revised ~e$ign plans for the proteblion of the 54-inch water main where it crosses the proposed storm sewer line. Dallas Water Utilities accepts your protection design with one change in the concrete from 3000 ID 4200 psi. If you have any questions, contact me at 214/948- 4337. Sincerely, Private Development Cooidinator (East Area) Engineering Services c' File 1_2/07,'00 TH[' 14:59 FAX 9724041833 LIBERTY ~003 . September 28, 2000 Mr. Mike Darnel. P.E. Nathan D. Maicr Two North Park 8080 P~-rk Lan~:, Suite 600 Daltas, TX 75231 Subject: Townhouses of' Coppell. NDM Job No 99-10-113 Crossing of Supply Line No. 3 Dear Mr. Darnel: Wc recewed the leucr ~nd plans for the proposed s£orm sewer for the above refercnced project The plans show about seven feet ofseparatmn hctween the p~pcs with the storm sewer hemg above our water supply line. We have reviewed th,,- plans and approve them w~th the following condition. ContTactor w~l[ COnlacl David Canady/l, hility Mamlenance Manager bt least 48 hours before excavating in our easement so that we can arrange to have one of our inspectors on site to verify the depth of installatton of your slorm sewer pipe. David can bc reached at 972 721-2244 or 972 721-2281. We appreciate your efforts to coordinate this crossing. If you have any questions or c~,~.c¢:ns. please contac[ me at 972 '~21-2281. Smcere!y. Todd w. Reck, P E. Water Resources Planning Manager Pc. Dave Ryburn, Asst. Die. Pubhc Works, Water Utilmc~ Davtc! Canady, Utili~, Mainte.'aance Managcr PO ~c'~ i~2288, i.(x ~:. TX 75015-2288 · 30~0 ~O;- I~:.....:~ Rosg. [~..~c. TX 75060 972.72].22~' - FAX 972 72] 22B~ FAX 9724041833 LIBERTY ~ 004 'Nx '"'~\ /~ NATHAN D_ MAIER ",....J V CONSULTING ENGINEERS. INC. October2,2000 Mr. Todd W. Reck, PE Water Resources Plarming Manager City of Irving Public Works Department Water Utilities Division P.O. Box 152288 Irving, TX 75015-2288 Subject: '[ownhouses of Coppell, NDM Job No: 99.10-113 Crossing of Irving Supply Line No. 3 Deax Mr. Reck: Upon further evaluation of our storm sewer crossing at the Irving water hnc, it has become evident that the elevation for the water line was incorrectly shown on our plan. As a result, the water line reeved up 1.64 feet_ Thc outside to outside separation is reduced from about seven feet to approximately 5.7 feet. In addition to correcting the location on thc drawing itself, I have added thc cond,,tion cf approval note. from your letter dated September 28, 2000 to the plan view of the drawing. We appreciate your attenlion to this mailer If you require ~ny more info..~r:ation or have questions please feel free to contact me at th~s office. Sincerely, Tim Andries N&than D. Meier, Consulting Engineers. Inc.