Townhouses-CS001012 (2) October 12, 2000
Craig Lemp
C.N. Lemp Development, Inc.
4101 McEwen, Suite 110
Dallas, TX 75244
RE: Townhouses of Coppeli
Fee Assessment Letter
Park Development Zone: Zone 2
Dear Mr. Lemp:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make pa~vrnent to the City of Coppell in the amount of S265.721.00 and forward
to the Finance Department along with a copy of the Fee Assessment table. This amount is
a portion of the assessed fees that need to be paid prior to Council approval. Also provide
a copy of the Engineer's estimate or contract to our office so the construction inspection
fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the pa>~nent of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
~lichael A. Martin, P.E.
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Debbie Ingram, Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary. Sims, Director of Leisure Services
...........................
255 ~-~i~TvAY 1ir P O BOX 4~/B 1¥ COPPELL TX 75019 ~' TEL 972/462 0022 1¥ FAX 972'304 3673
DEVELOPMENT FEE TABLE
Project: Townhouses of Coppell
Date: lO/12/oo
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $50,175.00 $50,175.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $4,800.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $2,471.01
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,536.12
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $3,255.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $41,850.00 $41,850.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $4,650.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $4,650.00
(100% due at Issuance of Building Permit)
Park Fee $118,220.00 $118,220.00
(100% due prior to Council Approval)
Roadway Impact Fee $55,476.00 $55,476.00
(100 % due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project H
Construction Inspection Fee Information not Available
II
TOTAL $288,173.13
TOTAL AMOUqNT DUE PRIOR TO COUNCIL APPROVAL $265,721.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Townhouses of Coppell
DATE: 10/12/00
Water Impact Fee:
Domestic Meter(s): 93 - 5/8 inch X 3/4 inch = 93 ESU's
Irrigation Meter(s): 2 - 2 inch = 16 ESU's
0 = 0 ESU's
Fireline Meter(s): I - 8 inch = 2.5 ESU's
Total #: 111.5 ESU's @ $450.00 ea. $50,175.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 96 Connections @ $50.00 ea. $4,800.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic ~Vater Meter Fee:
Total #: 93 Domestic Meter(s) @ $26.57 $2,471.01
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $189.37 $378.74
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 1 Fireline Meter(s) @ $2,157.38 $2,157.38
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 93 Meter(s) @ $35.00 ea. $3,255.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea. $90.00
(100% due prior to issuance of water meters)
~Vastewater Impact Fee:
Total Domestic Meters ESU's: 93 @ $450.00 ea. $41,850.00
Wastewater Tap Inspection Fee:
Total #: 93 Connections @ $50.00 ea. $4,650.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 93 Lots @ $50.00 ea. $4,650.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone: Zone 2
0 Single-family @ $1,285.00 per lot $0.00
92 Multi-family @ $1,285.00 per unit $118,220.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Road~vay Impact Fee:
(See attached fee calculations) $55,476.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Townhouses of Coppell
DATE: 10/12/00
ROADWAY IMPACT FEE:
Service Area * 7
Category ** Residential
Land Use ** Multi-Family
No. Lots/Units 92
Development Units ** 92.00
Vehicle Miles per Development Unit ** 2.01
Fee per Vehicle Mile *** $300
IRoadway Impact Fee due = (Development Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $55,476.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)