Loading...
Townhouses-CS000928 (2)September 28, 2000 Mr. Mike Daniel, P.E. Nathan D. Maier Two North Park 8080 Park Lane, Suite 600 Dallas, TX 75231 Subject: Townhouses ofCoppell. NDM Job No.: 99-10-113 Crossing of Supply Line No. 3 (( ~'t '~ ~t .... ~ ~,4 ' ~.,,3:; '.--: Dear Mr. Daniel: We received the letter and plans for the proposed storm sewer for the above referenced project. The plans show about seven feet of separation between the pipes with the storm sewer being above our water supply line. We have reviewed the plans and approve them with the following condition: ,, Contractor will contact David Canady:T:tihty Maintenance Manager at least 48 hours before excavating in our easement so that we can arrange to have one of our inspectors on site to refit3' the depth of installation of your storm sewer pipe. David can be reached at 972 721-2244 or 972 721-2281. We appreciate your efforts to coordinate th~s crossing. If you have any questions or concems, please contact me at 972 721-2281. Sincerely, Todd W. Reck. P.E. Water Resources Planning Manager Pc: Dave Rybum, Asst. Dir. Public Works. Water Utilities David Canady, Utility Maintenance Manager CITh' OF iRx,'IN~G PklU~ ~C \~"DR~,.~ L3F~-':.RI'.~,I'-,I * k¥..kTtR LlI~:l:'lrS ~I~'ISION YO Bo', 152288. la~ .x6. TX 75015-22Bfi · 3LX)O ROCK Is~.q~n RO&O. lax ,xc. TX 75060 972 721.2281 * FAN 972.7212280