ST0001-CS011031 T H ~ C I T Y 0 F
cOPPEi £
October 31, 2001
~. Jeff Cu~
T~ Elecffic & G~
4200 No~h Belt Line Road
I~ing, Texas 75038
Cree~iew Drive ~d Fre~o~ P~ay Project
ST 00-01
Li~ting ~provements - Cost ~alysis
De~ Mr. C~:
Enclosed plebe find a set of plus for the Cree~iew Drive ~d Fre~o~ P~ay
Project. As previously discuss~, we need a cost ~alysis to install ~e fo~dations,
conduit, wiring, poles, lm~aires, ~d the tie-in to ~e elecffic~ feed (~-key
installmion). The locmions of the li~ts ~e shorn in the plus. Single ~ lm~res
are m be installed along Cree~iew ~d dual ~ lmin~es ~e m be installed along
Freepo~ P~ay. The li~ting needs m match the recently installed s~eet li~ting along
Freepo~ P~ay, ~om Bethel Road no~hw~d to Creekview Drive. Also enclosed ~e
the bid schedule qu~tities for the lighting improvements.
Yo~ consideration of ~is ma~er is appreciated ~d should you have ~y questions or
need ~y additional infomation plebe call me at 972-304-7019.
Sincerely,
C.I.P. Coordinator
Enclosures
255 PARKWAY ~ P.O.BOX 478 * COPPELL TX 75OI9 ~trTEL 972/462 0022 * FAX 972/304 3673