Loading...
Townhouses-PT000607 'n,, c~ wth ^ B""t~ nm* STRUCTIONCON DEVELOPMENT PERMIT APPLICATION 1. Name of Applicant: (_.~/k} ~) ~t~ l)¢)Oj5/'m~./O ~L Phone Number: ~ 7Z- ~0q- ~3Z ~ ~ ~17 - 57}- )~ 2. Location ofConsmction (~r, ss): '~ ~ '.~ . ~aC~A< Subdivision Section ~ Block ~ ~t ~ Or: Survey/Abstract # Acreage Location description (attach vicinity map): 5¢ ~ ~]~ 3. Type of proposed construction or development: ( ) Residential ( ) Alteration of a natural waterway drainage course ( ) Non-residential ( ) Other (describe & attach drawing or sketch) (V~Placement of Fill (in right-of-way or on private property) 4. Description of Construction Permit requested: ( ) Paving ( ) Median or Landscaping ( ) Box Culvert ( ) Sidewalk ( ) Water Main ( ) Rip Rap ( ) Drive Approach ( ) R.C.P. (1/fFill Area ( ) Excavation ( ) Sanitary Sewer Main ( ) Drainage Channel Excavation ( ) Fire Lane ( ) Flume ( ) Slope Protection Retaining Wall ( ) Bridge ( ) Inlet ( ) Parking Lot · Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. Revised 3/99 CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. All construction shall follow the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and stamped approved plans. The activity shall be in compliance with Erosion and Sedimentation Ordinance. ~' gl0 i ~ ~ Od dt ~,~,, ce 6. Applicant shall provide one copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculations. 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work. ! Amount Paid ~/f~ Date Paid NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. Signature of Date FOR CITY USE ONLY Is the f'fll area located in an identified flood hazard area? ( ) Yes ~ No If yes, then a Floodplain Development Permit is required before any construction can begin. Is additional information required? ( ) Yes (~ No Are other federal, state or local permits required? ( ) Yes (~) No ~ PERMIT APPLICATION APPROVED ( ) PERMIT APPLICATION DISAPPROVED City Approval Date Form~/permits/constdev