Loading...
Townhouses-CS 991216 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-182, THE TOWNHOUSES OF COPPELL P & Z HEARING DATE: December 16, 1999 C.C. HEARING DATE: January 11, 2000 LOCATION: Along the east side of S. MacArthur Boulevard, approximately, 1,700' south of E. Sandy Lake Road. SIZE OF AREA: Approximately 10 acres of property. CURRENT ZONING: MF-2 (Multi Family-2) REQUEST: PD-TH-2 (Planned Development, Townhouse-2) for 92 TH units. APPLICANT: C.N. Lemp Development 4101 McEwen, Suite 110 Dallas, TX. 75244 (972) 404-8338 Fax: (972) 404-1833 HISTORY: There has been no recent development history on the subject tract, although a new school (Riverchase Elementary) is being constructed just south of the subject tract. TRANSPORTATION: MacArthur Blvd. is a P6D, six-lane divided street currently built as a four-lane divided thoroughfare contained within a 100-foot r.o.w. SURROUNDING LAND USE & ZONING: North- Wellington Place Apartment; MF-2 South - Riverchase Elementary School; SF-7 East - vacant land; PD-SF-7 West -single family homes; SF-7 Page # 11 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for high-density residential development. DISCUSSION: This is a request to change zoning from multi-family to townhouse. 'The major reason for the PD is to eliminate the alley requirement of townhouse development. Because the request reflects a reduction in intensity and density of the current zoning, staff generally favors this request. There are, however, some changes needing to be made to the request to garner total staff support. Among them is the fact that landscaping needs to screen the parking bays at the southeast and northeast sections of the development. In addition a ten-foot landscape buffer needs to be provided around these parking bays, landscape calculations need amendment, and the way the sign calculations were made needs furthei' explanation. The amount of brick shown on the elevation exhibits submitted with this case (the photos) show all brick buildings, yet notes on the color board indicate chimneys and "some" upper level wall surfaces will be dryvit. Staff had recommended the building be all brick (especially the rear), and further clarification regarding "some" dryvit needs to be addressed. We do not recommend dryvit/stucco--in fact, it is not a masonry product--and have special concern regarding its appearance along the southern boundary of the property. Because of the school playground adjacent, the entire south end of the townhouse development will be exposed to view from MacArthur Boulevard. An all masonry building is certainly much more aesthetic. In addition, the elevations show balconies at the rear of these structures. They should be enclosed (in fact, if they "faced" the street, they would be required to be) so that bar-b-q grills, toys, and other storage items are not visible from MacArthur. Also. staff has concern regarding the fencing between the school and townhouse project. What will it be composed of?. What will it look like? Is it a joint project with the school? Certain fire issues regarding the length of hose layment, and landscaping concerns--especially regarding tree mitigation--still need resolution. We also need to see what this project looks like from an elevation perspective as these units extend down Liberty Circle. The information provided shows the units as if they were build on a flat plain. At this location, there is a minimum 20-foot drop across the property. Also, the typical floor plans show fireplaces, yet no chimneys are shown on the elevations. Chimneys can serve as an architectural element and we certainly encourage their inclusion here. Finally, the applicant proposes rolled curbs with sidewalks adjacent. Staff is concerned with this proposal and recommends 4-foot sidewalks one foot off the property line (which effectively provides green space between the sidewalk and the street). Page # 11 In general, this is a good use for this property. However, there are a number of unresolved issues stated above that need further refinement before we can recommend approval of this request. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Although staff favors this use for the property, we recommend taking this request under advisement until several issues have been addressed, including: -if fireplaces are being provided, the elevations need to show chimneys -landscape calculations and screening need additional attention -effective area of identification sign needs to be shown -median opening with left-turn lane needs to be provided -address the Fire Departments coinments (attached) -tree reparation will be as submitted and approved by Leisure Services (comments attached) -the $1285 per dwelling unit park development fee will be paid -address Engineering's comments (attached) -provide accurate elevations of the units based upon grades -address staff's concern regarding brick on rear elevations -provide screened balconies -what type of screening between the school and townhouses is being provided, what does it look like, etc. We repeat that this can be a good project for the City. It does, however, need further refinement, a little more thought regarding details, and resolution of the issues brought out through the staff review process. ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Take under advisement until adequate information has been provided ATTACHMENTS: 1) Photo Package 2) Site Plan/Elevation/Landscaping/Irrigation/Tree Survey 3) Departmental Comments Page #11 DE VEL OPMENT RE VIE W COMMITTEE FIRE PRE VENTION COMMENTS ITEM: PD-182, THE TOIq'.¥HOUSES OF COPPELL DRC DATE: NOVEMBER 22, 1999 CONTACT: TRAVIS CRUMP, FIRE MARSHAL. (972) 304-3503 COMMENT STATUS: INITIAL PRELI31INAR Y FINAL 1. All portions of the buildings are to be within 150 feet of a fire lane. 2. Additional fire hydrants required along the 24' fire lane marked as "private drive". 3. A looped water line is required for the fire line. 4. No dead end fire lanes over 150 feet allowed. 5. These town homes will be required to be equipped with an automatic fire sprinkler system. ._ I~g/gg ~g CITY ~F ¢OPPELL ~ 9?2 304 ?092 - N0.074 ~04 DEVELOPMENT REVIEW COMMITTEE LEISURE SERVICES COMMEXIT.~ ITEM: The Townhouses of Coppell, Zoning Change ~F~ ~ ~ F~ ~ ~ [~' ~-~ DRC DATE: Igovember 23, 1999 and December 2, 1999 CONTACT: Brad Reid, Park Planning and Landscape M~nager PRELIMINARY REVISED A t'TER The trees surve~y indicates a total of 1436 inches of trees on site. 587inches of trees will be removed due to development, leaving 849 inches of trees. The preserved preserved trees will render a credit of 50% toward retribution of removed trees and the planting of 321 inches of new trees will give a 50% credit toward reparation, bio farther reparation should be due to offset the removal of the trees. The developer should be aware that the Park Development Ordinance is in affect for this development requiring the dedication of park land or $1,285.00 per dwelling unit in lieu thereof. Developer must notify the Parks Department at 972-304-3554 prior to performing any excavation in a median or ROW. The developer must repair any disturbed utilit!t to the satisfaction of the Parks Depargment. DRCl123h DEVELOPMENT REVIEW COMMITTEE BUILDING INSPECTION COMMENTS ITEI~: The To~nehouses of Coppell DRC DATE: Nm,ember 23, 1999 CONTACT: Greg Jones, Chief Building Official (304-3.500) COMMENT STATUS: ,,~ INIIZ4L PREI. IMEVARY FINAL CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: THE TOWNHOUSES OF COPPELL, PRELIMINARY PLAT P & Z HEARING DATE: December 16, 1999 C.C. HEARING DATE: January 11, 2000 LOCATION: Along the east side of S. MacArthur Boulevard, approximately, 1,700' south of E. Sandy Lake Road. SIZE OF AREA: Approximately 10 acres of property to accommodate 92 units. CURRENT ZONING: MF-2, Multifamily REQUEST: Preliminary Plat approval. APPLICANT: Owner: Engineer: C.N. Lemp Development, Inc. N.D. Maier, Engineers 4101 McEwen, Suite 110 Mike Daniels, P.E. Dallas, Texas 75244 8080 Park Lane (972) 404--8338 Dallas, Texas 75231 Fax: (972) 404-1833 (214) 739-4741 Fax: (214) 739-5961 HISTORY: There has been no recent development history on the subject tract, although a new school (Riverchase Elementary) is being constructed south of this site. T1La, NSPORTATION: MacArthur Boulevard is a P6D, major thoroughfare currently built as a four lane divided street, and contained within a 100-foot r.o.w. SURROUNDING LAND USE & ZONING: North- Wellington Place apartments; MF-2 South -elementary school under construction; SF-7 East - vacant residential land; PD 114 (SF-7) West -single family residences; SF-7 Page # 12 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for residential development DISCUSSION: This is a request to approve a preliminary plat on the subject property for construction of 92 townhouses. The merits of the zoning change were discussed with that application, so this review centers on the plat approval process. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Because of the recommendation to take the zoning case under advisement until several development issues can be resolved, this plat should be DENIED at this time. Once the development issues have been addressed, the plat can be resubmitted for consideration. ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request ATTACHMENTS: 1) Preliminary Plat Document 2) Departmental Comments Page # 12