Loading...
ST0003-EM011010 ~14 871 8757 SENT ~Y: XEROX 7033 ; 1 O- 1 O- 1 ; ,5: 0,SPM ; HU l TT-ZOLLARS, I NC. --, 972 304 3673 HUITF-ZOLL Dallas - Fort Worth - Houston -'El Paso - Phoonix - Tustin - Ontario- Albuquerc~ue FACSIMILE TRANSMITTAL DATE: 10/l 0/O1 HZ JOB NO: Coppell NUMBER OF PAGES (Including this cover sheet): 5 TO (COMPANY NAME): City of Coppell Engineering ATTENTION: Kenneth Griffin, P,E. FAX NUMBER: 972-30z~-3673 _X URGENT x FOR YOUR REVIEW __ PLEASE CALL UPON RECEIPT __ ORIGINAL TO FOLLOW NOTES / COMMENTS: Coppell Road Before we send you our proposal, we wanted to send you our opinion of probable construction costs for Coppell Road. We were surprised at the numbers and wanted you to look at them. If you need to discuss the numbers with us at a meeting just let us know. As we discussed in our meeting some time ago, there are some throw-away cost in the estimate Itemporary hmac paving, tempora~ drainage and temporary stripin~l). After we have discussed the costs and come to an a~lreement, we can have our proposal to you fairly quickly. I am also attaching our preliminary sheet count based on the scope of work to give you an idea of the size of the plan set. FROM: Kenneth Robertst P.E. SENT BY: KAI~ TIME: 5:00 PM DATE; If you have any problerns receiving this fax, pleaso call us at (214) 871-3311. 3131McKinney Avenue - Suite 600 - Dallas, Texas 75204 - (214) 871-3311 - FAX (214) 871-0757 Z14 87i 8757 SENT BY:XEROX 7088 ;10-10- 1 : $:05P~ ; HUITT-ZOLLARS, INC.~ 872 804 8678;# 2/ 5 COPPELL, TEXAS OCTOBER 8,2001 PRE-CONTRACT OPINION OF PRORABLE CONSTRUCTION COSTS COPPELL ROAD - SANDY LAKE ROAD TO BETHEL ROAD ITEM UNiT pROBABLE NO. DESCRIPTION UNIT QUANTITY PRICE COST IgAVING & UTILITY IMPROVEMENTS . ,1 PREPARING ROW ES 1 $50,000.00 $50,000 2 REMOVE EX. & TEMPORARY HMAC SY 28,350 $5.00 $141,750 3 REMOVE EX. CONG. PAVEMENT SY 2,109 $6.00 $12,654 4 UNCLASSIFIED STREET EXCAVATION CY 19,433 $8.00 $155,464 5 SELECT BORROW MATERIAL FOR TOPSOIL CY 2,343 $15.00 $35,145 6 REMOVE CONC. SIDEWALK SF 1,200 $1.00 $1,200 7 4 INCH THICK REI'r~F. CONG. WALK SF 49,5:)0 $3.00 $148,560 8 6 iNCH THICK REINF. CONG. DRIVE SY 1,002 $35.00 $35,070 9 6 INCH HIGH CONG. INTEGRAL CURB LF 7,000 $1.00 $7,000 10 8 INCH THICK REINF. CONG. PAVEMENT SY 23,898 $30.00 $716,940 11 B.C. ALLEY PAV~I;VlENT SY 30 $35.00 $1,050 12 HOT MIX FOR TEMPORARY PAVING TON 4,525 $54.00 $Z44,350 13 LIME STABILIZED SUBGRADE SY 25,075 $2.50 $62,688 14 HYDRATED LIME TON 501.5 $110.00 $55,165 15 6" THK MATERIAL FOR TEMP. MAINT. OF TRAFFIC SY 960 $10.00 $9,600 16 BERMUDA GRASS BLOCK SODDING SY 7,944 $3.00 $23,832 17 6" REINF. CONG. BARRIER FREE RAMP SF 768 $5.00 $3,840 18 REMOVE AND RESET TRAFFIC CONTROL SIGN EA 20 $200.00 $4,000 19 GRASS SEEDING BY HYDROMULCHING SY 2,222 $1.00 $2,222 20 2 INCH PVC STREET LIGHT CONDUIT ............. LF 6,300 $5.00 $31.500 21 4 IN NON-REFLEC TRAFFIC BUTTON EA 80 $3.00 $240 22 4 IN REFLEC TRAFFIC BU-I-I-ON TYPE II-Y-Y EA 135 $5.00 $675 23 4 IN FIRE/HYD sTREET MARKER EA 10 $7.00 $70" 24 4 IN THERMOPLASTIC LANE MARKER YELLOW LF 11,000 $1.25 $13,750 25 4 IN THERMOPLASTIC'LANE MARKER WHITE LF 400 $1.25 $500 26 18 IN THERMOPLASTIC STOP LINE MARKER LF 108 $6.00 ' $648 27 6 IN ~HERMOPLASTIC CROSSWALK MARKER LF 108 $2.00 $216 28 24 IN THERMOPLASTIC CROSSWALK MARKER LF 54 $8.00 $432 29 THERMOPLASTIC ADVISORY MARKER EA 2 $500,00 $1,000 30 4 IN TEMPOI~'ARY MARKING YELLOW LF 21,600 $0.50 $10,800 31 BETHEL INTERSECTION TRAFFIC SIGNALS LS 1 $40,000.00 $40,000 32 ADJUST 1" WATER METER & BOX " '~A 40 $400.00 $16,000 33 ADJUST WATER VALVE COVER & VALVE STACK EA 12 $300.00 $3,600 34 ADJIJS'T' WASTEWATER MANHOLE (24" LID) EA 6 $400.00 $2,400 35 SCHOOLZONE FLASHER EA P $4,000.00 $8,000 36 IRRIGATION MODIFICATIONS LS I $20,000.00 $20,000 I:\proj\o1999901\KAR~coppell\coppell road\estimates\lO0501 .×IS 1 o/1 o/t)1 4:12 PM ~14 871 8?57 'SENT ~Y:XEROX 7033 ;10-10- 1 ; 5:06PM : HUITT-ZOLLARS, INC.~ 972 304 3673;# 3/ 5 COPPELL, TEXAS OCTOBER 8,2001 PRE-CONTRACT OPINION OF PROBABLE CONSTRUCTION COSTS COPPELL ROAD - SANDY LAKE ROAD TO BETHEL ROAD COPPELL ROAD PAVING & UTILITY IMPROVEMENTS ITEM UNIT PROBABLE NO. DESCRIPTION ... UNIT QUANTITY PRICE COST PAVING & UTILITY IMPROVEMENTS HISTORIC DISTRICT - 37 IRRIGATION SYSTEM (INCLUDING, CONDUIT) LS 1 $25,000,00 $25,000 __..38 IRRIGATION TAP & VALVE EA' 2 $2,500.00 $5,000 39 BENCHES ... EA 8 '"$500.00 $4,000 40 TRASH CANS EA 8 $500.00 $4,000 41 TREE GRATES EA 50 $1,500.00 $75,000 42 SIDEWALK PAVERS @ TREEs SF 800 $3.00 ' $2,400 43 TREES EA 50 $400.00 ' $20,000 44 STR~-i~I LIGHT. EA 14 $2,500.00 $35,000 45 STRE. E..'.I. LIGHT FOUNDATION EA 14 $700.00 $9,800- 46 GATEWAY COLUMN EA 4 $10,000_00 $40,000 47 BR.I.CK CR~WALK SF '600 $4.00 $2,400 PAVING & UTILITY IMPROVEME~iTS TOTAL '" $2,082,961 h\proj~0199990t ~;AR\coppell~coppell ~'oad~estimates\100501 .xls 10/10/01 4:12 PM 214 871 8757 SENT BY:XEROX 7088 :10-10- 1 ; $:08PM ; HUITT-ZOLLARS, INC.~ 872 804 8873;# 4/ ~ COPPELL, TEXAS OCTOBER 8,2001 PRE-CONTRACT OPINION OF PROBABLE CONSTRUCTION COSTS COPPELL ROAD - SANDY LAKE ROAD TO BETHEL ROAD ITEM ,,, UNIT PROBABLE NO. DESCRIPTION UNIT QUANTITY PRICE COST DRAINAGE IMpROVEMEN'~S 48 18 INCH CLASS III REINF. CONG. PIPE LF 235 $45.00 $10,575 49 21 INCH CLASS III REINF. CONG. PIPE LF 580 $50.00 $29,000 50 24 INCH CLASS II!.REINF. CONG. PIPE LF 600 $55.00 $33,000 51 30 INCH CLASS III REINF. GONG. PIPE LF 700 $65.00 $45,500- 52 36 IN.CH CLASS I!1 REINF. CONG. PIPE LF 450 $80.00 $36,000 ~ 48 INCH CLASS III REINF. CONG. PIPE LF 1,100 $130.00 $143,000 54 54 INCH CLASS Ill REINF. CONG. PIPE LF 500 $155.00 $77,500 55 60 INCH CLASS III REINF. CONG. PIPE LF 300 $180.00 $54,000 56 66 INCH CLASS III REINF. GONG. PIPE LF 1,850 $205.00 $379,250 57 10 FOOT INLET EA 9 $2,500.00 $22,500 58 14 FOOT INLET EA 24 $3,500.00 $84,000 59 TYPE Y INLET EA I $2,750.00 $2,750 60 SIX GRATE INLET EA ...... 2 $3,500.00 $7,000 61 6 FOOT ...MANHOLE EA 6 $5,000.00 $30,000 62 REINF. CONG. FOR PIPE HEADWALL Cy 8 $400.00 $3,200'' §3 GABION STRUCTURE CY 555 $150.00 $83,25~- 64 UNCLASSIFIED CHANNEL EXCAVATION- CY 1,000 $10.00 $10,000 65 REMOVE DRIVE CULVERT LF 540 $10.00 $5,400 66 TRENCH SAFIE,¥ LF 6,315 $1.00 $6,315 67 EROSION CONTROL LS I $25,000.00 $25,000 68 200' BRIDGE ($45 PER SQUARE FOOT) LS I $540.000.00 $540,000 69 TEMPORARY 24" HDPE PIPE LF 800 $75.00 $60,000 70 TEMPORARY 3§" HDPE PIPE LF 800 ' $100.00 $80,000 71 TEMPORARY 48" HDPE PIPE LF 3,000 $125.00 $375,000 72 TEMPORARY TYPE Y INLET EA 10 $3,000.00 $30,000 DRAINAGE IMPROVEMENTS TOTAL $2,172,240 PAVING & UTILITY IMPROVEMENTS TOTAL $2,082,961 DRAINAGE IMPROVEMENTS TOTAL $2,172,240 PROJECT TOTAL $4,255,201 I;~proj',01999901\KAR~coppell'tooppell road~stimalOs\100501 .xls ~ 0/~ 0/01 4:12 PM ~1~ 871 0757 SENT'~Y:XEROX 7033 :10-10- 1 ; 5:00PM ; HU1TT-ZOLLARS, INC.~ 872 304 8673;# 5/ 5 SHEET COUNT Coppell Road PLAN DESCRIPTION NO. OF SHEETS QUANTITY SUMMARY SHEET 4 HORIZONTAL CONTROL PLAN 2 PAVING PLANS 13 DRAINAGE AREA MAP 3 DRAINAGE CALCULATIONS 3 STORMWATER PLANS 13 CONSTRUCTION SEQUENCING 12 STREETSCAPE PLANS ::" BRIDGE PLANS /~,D. SIGNALIZATION PLANS GENERAL NOTE. & TYPICAL SECTIONS 2 POLLUTION CONTROL PLANS 6 STRIPING & SIGNAGE PLANS 6 STREETSCA PE DETAILS ~ 4-) SIGNA I. DETAILS '6 COVER SHEET 2 ROADWAY CROSS-SECTiONS 30 BRIDGE DETAILS ,/7 SHEET TOTAL 143