ST9801-CS 990908 (6)~FELEX 820590 FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS. TEXAS 75354-0787 DALLAS, TEXAS 75220 September 8, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Rc: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Mr. Griffin: Attached for your review is our proposed consauction schedule for the referenced project. As reflected by the schedule, it is our intent to pursue the project in three sections and begin work in November 1999 when we take delivery of the PVC water line. Each of the sections will be closed to through traffic during consauction with local traffic detoured around the applicable construction area. Please inform our office if you have any questions regarding this information. Si cerely, 3 ~te15 C ns 'on Robert D. Weber Project Engineer Company AN EQUAL OPPORTUNITY EMPLOYER '1' ID ~1 Task Name Duration I r=~ Set Barricades 2 days 2 Relocate Fence 5 days 3 Remove Trees 5 days 4 Install Water Line 40 days 5 Phase 1 (SL to Westminster) 125 days 11 Removals 6 days 6 Box Culvert 40 days 8 Storm Sewer Line A 3 days 9 Storm Sewer Line B1 10 days  Riprap 15 days Excavation/Embankment 15 days 10 Storm Sewer Line B2 8 days 13 Lime Stabilization 12 days 14 Concrete Paving 10 days 15 HMAC Transition 4 days 17 Driveways 7 days 19 2nd Stage Inlets 5 days 16 Pavers 6 days 18 Sidewalk/Bike Trail 15 days 20 Cleanup 10 days 21 Grass 4 days ,~ Pavement Markings 4 days Traff'm Switch 2 days 24 Phase 2 (8H121 to Comer) 80 days 25 Storm Sewer Line C1 5 days 26 Storm Sewer Line C2 5 days 27 Removals 3 days 28 Excavation/Embankment 6 days 26 Lime Stabilization 6 days 30 Concrete Paving 6 days Task P~oject: COPPELL ROAD RECONST 'Date: Mort 9/6/99 Critical Task Progress r ~412~ 1281 5 1~21~91261 2 I9 1~6123130 ~lllllllllllllllltllllllllilllllllllllllllllllllt COPELL ROAD RECONSTRUCTION I Ja,.--~ I Feu~ry I Ma~ I.~t J6 1~31201271 5 l~2l~912612 19 1~6123 -i Illl Milestone Summary Rolled Up Task May 3ol 7 1~412~ 12, Ro~ Up C.t~ Task K\\\\\\\"'I Rolled Up Milestone ~ External Tasks Rolled Up Progress III Fh'oject Summary June IJdy ' ID {} Task Name Duration 31 HMAC Transition 4 days 33 Driveways 2 days 35 2nd Stage Inlets 3 days 32 Pavers 4 days 34 Sidewalk/Bike Trail 3 days 36 Cleanup 7 days 37 Grass 3 days 38 Pavement Markings 3 days 39 Traffic Switch 1 day , :~ .Phase 3 (VVestmlnster to Comer) 17 days Removals 2 days 42 Excavation/Embankment 2 days 43 Lime Stabilization 4 days 44 Concrete Paving 3 days 46 Ddveways I day 48 2nd Stage Inlets 3 days 45 Pavers 2 days 47 Sidewalk/Bike Trail 3 days 51 Signs 3 days 52 Bollards 2 days 53 Plant Trees 5 days  Cleanup/Sell 10 days Grass 3 days 50 Pavement Markings 3 days COPPELL ROAD RECONSTRUCTION r I December I ~a.=ry I FebmaW I Ma~ I April I May 141211281 5 1421'91261 219 1'61231301 6 1,31201271S 1'21'91261 2 I9 l'6 2312OI 7 ! JURe July Task Pioject: COPPELL ROAD RECONST Critical Task Date: Mon 9/6/99 Prograss Milestone Summary Rolled Up Task Ro.~ Up C~=~ Task t',,\\\\\\\"4 Rolled Up Milestone ~ Rolled Up Prograss Split External Tasks Project Summary