Loading...
Town Center L4B1-LR010928ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: CONSTRUCTION MANAGEMENT GROUP DALLAS, TEXAS PROJECT: COPPELL TOWN CENTER COPPELL, TEXAS DATE: 09/28/01 OUR REPORT NO: 01612-22 TECHNICIAN: O.A. WEATHER: CLEAR TO 60 TEMPERATURE RANGE: 50 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. THE TECHNICIAN OBSERVED THE PRE-POUR CONDITION OF FOUNDATION SLAB FOR THE ENTIRE BUILDING FROM LINE A TO F BETWEEN LINE 1 TO 8. THE TECHNICIAN OBSERVED THE AREA FOR PROPER VAPOR BARRIER, GRADE BEAM SIZE, AND STEEL REINFORCING. NO DEFICIENCIES WERE NOTED DURING THE OBSERVATION. THE TECHNICIAN MOLDED 3 SETS OF 4 TEST CYLINDERS FROM CONCRETE PLACED FOR SLAB ON THIS DATE. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. LARRY WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVES, CITY OF COPPELL LEE STONE, CITY OF COPPELL Our test results and rep<xts are for the exclusive use of the client (and their designated recipients on file in our office) and shal not be reproduced and/< distributed exce? ~ express eppr~r_-_a ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or obsel ~d, and are not indicative of the qualities of apparently identical or similar specimens. Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting