Town Center L4B1-LR011102ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
Tested For: CONSTRUCTION MANAGEMENT GROUP
ATTN: MR. JEFF MILLER
5207 MCKINNEY AVENUE, SUITE 12
DALLAS, TX 75205
Fax Number: (214) 521-1279
Project Desc: COPPELL TOWN CENTER
120 N. DENTON TAPP-- COPPELL, TX
Concrete Compression Test
Report
Our Report No.: 01612-21
Issue Date: 11/02/2001
FIELD DA TA
Placement Location:
Date Placed:
Time Placed:
Slump (ASTM C-143):
Air Content:
Air Temperature:
Specimen Temperature:
Date Received:
Delivery Method:
Field Data Submitted By:
Mix Data Submitted By:
PAVING; PARKING LOT, 20~/V & 40'N FROM THE NW CORNER OF THE BUILDING
9/26/01
9:25 AM
4
4.5 (ASTM C-173)
74
76
9/27/01
PICKED UP BY ALPHA
MAGALLON, E.
BEALL
Plant Number: 89-4000
Delivery Ticket No.: 89002665
Made By:. ALPHA
Cured Specification: ASTM C-31
CYLINDER COMPRESSION TEST RESUL TS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: T~/pe: Spec: Tested: IDa~/sl: Len~lth Width Diameter Sq. In. Load: PSI:
21 LAB C-1231 10/3/01 7 12 N/A 6 28.27 90117 3180
22 LAB C-1231 10/24/01 28 12 N/A 6 28.27 115040 4060
23 LAB C- 1231 10/24/01 28 12 N/A 6 28.27 108050 3820
24 LAB HOLD HOLD 12 N/A 6 28.27 0
Specifications: 28 3006
Results to Date: PASS
Notes:
CC: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP
Respectfully Submitted By: /~ ~'~ f' of Alpha Testing, Inc.
_-
_
Our te~l. result~ and re,mare for the exdudve uSeof the ~llent (a~d their desi~ated receplens on ltle In our olflce)and shall not be reproduced and/or dl.~-tl)uted except
· with expre~ approval of ALPHA. The u~e of our name and te~t result~ must receive our written approval. Te~ result~ and reports apply only to the samples tested and/or
olx~rved, and are not Indicative of the qualities of apparently Identical or similar specimens.