Loading...
Town Center L4B1-LR011025ALPHA TESTING, ,NC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 Tested For: CONSTRUCTION MANAGEMENT GROUP ATTN: MR. JEFF MILLER 5207 MCKINNEY AVENUE, SUITE 12 DALLAS, TX 75205 Fax Number: (214) 521-1279 Project Desc: COPPELL TOWN CENTER 120 N. DENTON TAPP-- COPPELL, TX Concrete Compression Test Report Our Report No.: 01612-19 Issue Date: 10/25/2001 FIELD DA TA Placement Location: Date Placed: Time Placed: Slump (ASTM C-143): Air Content: Air Temperature: Specimen Temperature: Date Received: Delivery Method: Field Data Submitted By: Mix Data Submitted By: PAVING, 59~N & 10'S FROM THE NW CORNER OF THE PROPOSED BUILDING 9/24/01 10:20 AM 5 5 (ASTM C-173) 70 89 9/25/01 PICKED UP BY ALPHA BUSTAMANTE, MARTY BEALL Plant Number: 89-4000 Delivery Ticket No.: 89002475 Made By:. ALPHA Cured Specification: ASTM C-31 CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: {Oa~st: Len~lth Width Diameter Sq. In. Load: PSI: 17 LAB C-1231 10/1/01 7 12 N/A 6 28.27 114123 4030 18 LAB C-1231 10/22/01 28 12 N/A 6 28.27 153910 5440 19 LAB C- 1231 10/22/01 28 12 N/A 6 28.27 153700 5430 20 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3600 ' Results to Date: PASS Notes: cc: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP Respectfully Submitted By: ~'.4~'~ ~.~" ~,'~ of Alpha Testing, Inc. Our test results and reports are for the exclusive use of ~'e Clle~(and their designated receplents on file In our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not Indicative of the qualities of apparently Identical or similar specimens. :'i 7(~t~ni~i ~i~i~eri~-, construction Materials Testing ·: Envi~0~ental Engih~Hr~g · con~Ul~in~~' : 11422