Loading...
Town Center L4B1-CS010705 T H E C I T Y 0 F CO P-ELL July 5, 2001 JDJR Engineers & Consultants, Inc. 2505 Texas Drive, Suite 109 Irving, TX 75062 RE: Town Center Addition, Lot 4, Block FILE Dear Mr. Dewey: The City of Coppell has reviewed the referenced plans and has the following comments to offer: 1. Do not include the City of Coppell's Standard Details with your construction plans. They are only to be referenced in your construction plans. All contractors and subcontractors are required to have a complete set of the City of Coppell Construction Standards on the job site. We do not include them with the construction plans. 2. Please comment as to why you have revised the location of your sewer service to this building. The new location requires you to bore Town Center Blvd. and dig to make a connection to a manhole and actually install more linear feet of pipe. The comment on the original location was if you are tying into a manhole then it should be relocated out of the sidewalk. That comment still stands. If there is an existing manhole, the sidewalk should not go through the manhole. The sidewalk should go around the manhole, or the manhole should be relocated. 3. It was noted on the prior construction plans that a wastewater access device should be provided. This device should be provided at the property line. If you have any questions, please contact me at 972/304-3686, otherwise please make the appropriate changes and resubmit the plans for approval. The City requires three sets for office. You should also submit adequate copies for all contractors and subcontractors to have a approved set while they are working on this project. Sincerely, Kenneth M. rtffin, P.E. Director of Engineering & Public Works 255 PARKWAY ~f P.O BOX 478 ~t COPPELL TX 75019 !['TEL 972/462 0022 1IrFAX 972/304 3673