Town Center L1B2-CS 99100910/08/99 FRI 10:49 FAX 972 8~ 9888
NORTtt A~IERICCN
NORTH AMERICAN
PROPERTIES SOUTHWEST
October 7,1999
{~002
Mr. Mike Martin
City of Coppeil
255 Parkway Blvd.
Coppell, Tx 75019
Re: Storm sewer improvements
106 N Denton Tap ~ Sandy Lake Rd.
Mike,
Pursuant to our conversation this morning and my meeting with your contractor's
representative, Gary Pryor (Ed Bell Construction), North American Properties -
Southwest authorizes the removal of approximately four (4) Indian Hawthorne shrubs
and one(I) irrigation line and head (cut and plug), to complete the storm sewer
improvements for the widening of Sandy Lake Road. In addition, one or two small post
oaks (3'cal.) will have to be removed as well. Brad Reid has authorized their removal for
these improvements.
NAP-Southwest will be responsible for replacement of the shrubs and returning the
irrigation system to working order. The trees will not be replaced as they do not affect
the landscape and or tree ordinance.
Please call with any questions.
Sincerely,
Mark Morris
NAP-Southwest
Copy: John Maggiore/NAP, G. Juarez/Dowdy Anderson, Gary Pryor/Ed Bell Const.
14990 Landmark Blvd. * Suite 300 * Dallas, TX 75240-6729
972/866-9555 Telephone
972/866-9888 Fax
9?2 1366 9888
10/08/99 FRI 10:48 FAX 972 8)~,9888 NORTH ARERICCN ''" 8001
NORTH AMERICAN PROPERTIES - SOUTHWEST
Copy:
FROM:
# of Pages (including cover):
14990 Landmark Blvd. · Suite 300
Dallas, Texas 75240-6729
Telephone: 972.866.9555
Fax: 972.866-9888
Mr. Mike Martin P.E.
Asst. City Engineer
City of Coppell
255 Parkway Blvd.
Coppell, Tx 75019
DoxxC'_ _y, ,~m,so~ ,~D ^sSoc~_ ~s, ~c.
CIVIL ENGINEERS
5225 VILLAGE CREEK DRIVE SUITE 200
PLANO, TEXAS 75093
(972) 931-0694 FAX (972) 931-9538
February18,1998
Town Center Addition
Lot 1, Block 2
Dear Mike:
Upon final review of the construction plan for phone one of the shopping center, I recommend
that the following improvements be deferred until the construction of Sandy Lake Road.
ITEM QUANTITY UNIT UNIT COST AMOUNT
8' Curb Inlet 1 EA. 1,800.00
18" RCP 50 L.F. 22.00
5' Wide Sidewalk 1,575 S.F. 2.00
(315 L.F.)
Remove Concrete Flume 1 L.S. 800.00
1,800.00
1,100.00
3,150.00
800.00
TOTAL ALL ITEMS
$ 6,850.00
The developer realizes that Sandy Lake Road will be under construction this summer, begihning
with utility relocations. The utility relocations will destroy the above referenced improvements.
Willia A.Zrson, p.E'
Please accept this proposal with the attached check in the amount of $6,850.00 to allow the City
to install said improvements with Sandy Lake Road. If you have any questions, please contact
Guillermo Juarez.