Loading...
Town Center L4B1-CS010705 (3)ID] R ENGIN-I:IEITS AND CONSULTANTS, INC. CIVIL ENGINEERS · SURVEYORS · LAND PLANNERS · CAD DESIGNS July 5, 2001 07-05-01P04:50 RC City of Coppell Engineering and Public Works Department 255 Parkway Coppell Texas 75019 Attention: Kenneth M. Griffin, P.E. Director of Engineering and Public Works Re: Town Center, Lot 4, Block I Mr. Griffin: We have revised the civil plans for the above referenced project in accordance to your second plan review comments dated July 5,200I. The specific changes made to the plans in response to each of your plan review comments are listed on the attached plan revision summa~, sheet. Should you have any questions or require additional information, please do not hesitate to contact me. Sincerely, Cc: Project file Buddy Conner, NCA Architects 2505 TEXAS DRIVE, SUITE 109 IRVING, TEXAS 75062 TEL (972) 252-5357 FAX (972) 273-8860 PLAN REVISION SUMMARY SHEET Project: Town Center, Lot 4, Block I Date: July 5, 2001 Plan Review Comments By: Kenneth M. Griffin, P.E. dated July 5, 2001 Comment No. 3, Description of Plan Revision The references to the City Details have been removed from the cover sheet. There is not an existing manhole on the existing sanitary sewer stub-out, therefore a new manhole would need to be constructed. So, we showed connecting into the existing manhole in lieu of constructing a new one. Also, the manhole should be on the main, not on the existing stub-out. In addition, we would prefer the rim of the nearest downstream manhole to be lower than the lowest finished floor elevation. A standard clean-out was added on the proposed sanitary sewer service at the property (right-of-way) line.