Town Center L4B1-CS010607DEVELOPMENT FEES
PROJECT NAME: Town Center Addition, Lot 4, Block 1
ENGINEER: Dowdey Anderson
ORIGINATION DATE: 10/9/00
SENT
ASSESSMENT
ASSESSED FEE AMOUNT PAZD
DATE
Park Fee
10/9/00 Water Impact Fee $10,575.00
NSF check for above
Water Impact Fee
10/9/00 Wastewater Impact Fee $7,200.00
NSF check for above
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
Total Fees
$17,775.00
$10,575.00
$7,200.00
notify street dept.
Notify utility dept.
when meters, taps
or deposits are paid
11/3/oo
6/7/01
11/3/00
6/7/01
Fees Paid Amount Owed
$17,775.00 $0.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.