Loading...
Town Center L4B1-CS010607DEVELOPMENT FEES PROJECT NAME: Town Center Addition, Lot 4, Block 1 ENGINEER: Dowdey Anderson ORIGINATION DATE: 10/9/00 SENT ASSESSMENT ASSESSED FEE AMOUNT PAZD DATE Park Fee 10/9/00 Water Impact Fee $10,575.00 NSF check for above Water Impact Fee 10/9/00 Wastewater Impact Fee $7,200.00 NSF check for above Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Total Fees $17,775.00 $10,575.00 $7,200.00 notify street dept. Notify utility dept. when meters, taps or deposits are paid 11/3/oo 6/7/01 11/3/00 6/7/01 Fees Paid Amount Owed $17,775.00 $0.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.