REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH D~tLLAS PARKWAY
DALLAS, TX 75248
REVISION #1
DATE: January 18, 1999 OUR REPORT NO.: 341-80053-55
FIELDDATA: Concrete was delivered by REDI-MIX, mix number 910-9265.
i ; SPECNENS ! SUPPLIER . TIME TRUCK TIME TRUCK YARDS 0F / AIR ~ ............
= ! i 53 58
1 i 4=' 17674 09:00 am 09:10 am i 30.0 3 3/4 ,
...... _~_ .................. ~ ...........................................~ ....................... ~ .................... ~ .....
LOCATION:
i ' FROM EXISTING ROADWAY BEGINNING OF LEFT TURN LANE, 30' SOUTH AND 5' EAST
NOTE: APPLICABLE ASTM STANDARDS. UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-91; SLUMP: C143-90a; AIR CONTENT: C231-91b; TEMPERATURE: C1064-86(93}
REMARKS: Observed the placement of 50.0 cubic yards of concrete.
TECHNICIAN: FORT WORTH Respectfully subm~ted,
TIME: 07:15 am - 10:10 am ProfessionalServicelndustries, lnc.
THEBE TEST R~SUI.T8 AP~.y OI~y TO ~ ~CIFIC SAMPt. E8 TESTED AND MAY NOT BE INDICATIV~ OF THE ENTIRE CONCRETE PLACEMENT.
REIN~RT8 MAY NOT BE REPROOUCED. EXCEPT IN FULL. WtTHOUT WRITTEN F~RMI$$10N BY PROFE881ONAL 8ERVICE INOU~TRIES. INC.
,,s, A-200-t dr Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612
Information
o Build On
-...t.,ee~h~ · ~_~n?~ · ~
DAILY FIELD REPORT
TESTED FOR: MII{~ MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
D~J~LAS, TX 75248
REVISION #1
DATE: January 18, 1999 OUR REPORT NO.: 341-80053-56
WEATHER:
TEMPERATURE RANGE: 4 3 TO: 7 0
INSPECTOR: C~RIS WEBB
TYPE OF INSPECTION BEING PERFORMED
__ SOILS CONCRETE
__ FOUNDATIONS BATCH PLANT
__ CONTROLLED FILL (COMPACTION) __ PLACEMENT (JOB SITE)
__ASPHALT X OTHER
__BATCH PLANT X REBAR INSPECTION
__PLACEMENT(JOB SITE)
BRIEF RESUME OF VVORK ACCOMPLISHED THIS DATE:
On this date, a representative of PSI traveled to the site to perform a
rebar inspection. #3 rebar was placed at 12" centers.
Respectfully submitted,
Professional Service Industries, Inc.
REI~RT8 MAy NOT BE REPROOUCEI), EXCEPT IN FULL. WITt4OUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC.
,.300-2 (~)~ Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612
Information
.To Build On
DAILY FIELD REPORT
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
DALLAS, TX 75248
DATE: January 18, 1999 OUR REPORT NO.: 341-80053-56
WEATHER:
TEMPERATURE RANGE: 43 TO: 70
INSPECTOR: CHRIS WEBB
TYPE OFINSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
__CONTROLLED FILL(COMPACTION) __PLACEMENT(JOB SITE)
ASPHALT X OTHER
BATCH PLANT X REBAR INSPECTION
~PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, a representative of PSI traveled to the site to perform a
rebar inspection. Three rebars was placed at 12" off the center.
Respectfully submitted,
Professional Service Industries, Inc.
REPORTS M/kY NOT BE REPROOIJCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMI~ION BY PROFESSIONAL SERVICE INOU~TRIES. INC.
~s, ^400-2 (~, Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612