Loading...
Town Center L4B1-CS001128T H E C I T Y O F November 28, 2000 Empire Financial Corporation 10670 North Central Expressway, Suite #235 Dallas, Texas 75231 Dear Sir or Madam:, Your check was returned to us due to insufficient funds. Check Number Dated Check Amount #1384 October31,2000 $17,775.00 In order to resolve this problem, you will need to either mail or come in with cash or money order for $17,800.00 which includes a $25.00 returned check charge. Please send the payment to the attention of Carolyn Bebermeyer~ Finance Department. We will need to receive this payment by December 5, 2000. Thank you for your prompt attention to this matter. Sincerely, Carolyn Bebermeyer Senior Accounting Technician enc: copy of check 25~i PAF~KWAY 'A' P O BOX 479 'A' COPPELL TX 7'iOI9 'k TEl- 972/462 0022 t' FAX 972/304 3673 DEVELOPMENT FEES PROJECT NAME: Town Center Addition, Lot 4, Block 1 ENGINEER: Dowdey Anderson ORJGINA-I'ION DATE: 10/9/00 II SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee :[0/9/00 Water Impact Fee $10,575.00 $:10,575.00 :[:[/3/00 NSF check for above $:[0,575.00 :[0/9/00 Wastewater Impact Fee $7,200.00 $7,200.00 :11/3/00 NSF check for above $7,200.00 Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Total Fees $35,550.00 notify street dept. Notify utility dept. when meters, taps or deposits are paid Fees Paid Amount Owed $17,775,00 $17~775,00 N~F Oheck NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.