Loading...
Town Center L1B3-LR 980924 Geotechnical IJ *' l. Con~ultfng · E,:_I~.~-_' &.. · Testing DAILY FIELD REPORT TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DD~LLAS, TX 75248 DATE: September 24, 1998 OURREPORTNO.: 341-80053-43 WEATHER: TEMPERATURE RANGE: - -- TO: - -- INSPECTOR: FLOYD PALMER TYPE OF INSPECTION BEING PERFORMED SOILS X CONCREIE FOUNDATIONS BAICH PLAN/ __ CONTROLLED FILL (COMPACTION) __ PLACEMENT (JOB SITE) X CYLINDER PICK-UP ASPHALT OTHER BATCH PLANT __ PLACEMENT (JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: On this date, a representative of PSI picked up three sets of four concrete test cylinders cast on 9/23/98 and transported them to our laboratory for curing and testing. Respectfully submitted, Professional Service Industries, Inc. REPORTS MAY NOT BE REPROOUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFES,~ONAL SERVICE INDUSTRIES. INC. Information To Build On PS, ^.aDD-= o)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/333-2853