Town Center L1B3-LR 980924 Geotechnical
IJ *' l.
Con~ultfng · E,:_I~.~-_' &.. · Testing
DAILY FIELD REPORT
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
DD~LLAS, TX 75248
DATE: September 24, 1998 OURREPORTNO.: 341-80053-43
WEATHER:
TEMPERATURE RANGE: - -- TO: - --
INSPECTOR: FLOYD PALMER
TYPE OF INSPECTION BEING PERFORMED
SOILS X CONCREIE
FOUNDATIONS BAICH PLAN/
__ CONTROLLED FILL (COMPACTION) __ PLACEMENT (JOB SITE)
X CYLINDER PICK-UP
ASPHALT OTHER
BATCH PLANT
__ PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, a representative of PSI picked up three sets of four
concrete test cylinders cast on 9/23/98 and transported them to our
laboratory for curing and testing.
Respectfully submitted,
Professional Service Industries, Inc.
REPORTS MAY NOT BE REPROOUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFES,~ONAL SERVICE INDUSTRIES. INC.
Information To Build On
PS, ^.aDD-= o)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/333-2853