Town Center L1B3-LR 980923 ~'A ~ · Geotechnical
I~k~ ~l l Construct ion
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
DALLAS, TX 75248
DATE: September 23, 1998 OUR REPORT NO.: 341-80053-42
FIELD DATA: Concrete was a 4000 psi mix delivered by REDI-MIX,
mix number 732.
NO. OF · CONCRETE TEMPE~TURE. °F
SPECIMENS SUPPLIER TIME TRUCK ' TIME TRUCK Y~DS OF ! AIR ........
DISPATCHED i ................ : ..........................
SET NO. __ MADE I TICKET NUMBER i UNLOADED CONCRE~ SLUMP. IN I CONTENT, % AIR CONCRETE
I i
477 41 12305 I 03:00 am i03:30 am 40.0 -5 3/4 i 4.9 72 94
L ...... , .......... ~ ............... : .............. ~ .....
478 4 12314 03:48 am 06:00 am 130.0 6 : 4.8 72 94
479 4 i 12352 09:40 am 10:05 am 240.0 6 1/4 ~ 4.8 ' 89 95
........... 4 ........ '--- ............ ~ ....
'
LOCATION: PAVING
477 ~ 30' SOUTH X 15' EAST OF NORTHEAST CORNER OF SLAB
478 120' SOUTH X 25' EAST OF NORTHEAST CORNER OF SLA~
479 i 40' SOUTH X 120' EAST OF NORTHEAST CORNER OF SLAB
NOTE: APPLICABLE AS~ STANDARDS. UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-91; SLUMP: C143-~a;AIR CONTENT: C231-91b: ~MPE~TURE: C1~4~6(93)
REMARKS: Observed the placement of 270.0 cubic yards of concrete.
TECHNICIAN: FLOYD PA3_&4ER Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULT'= APPLY ONLY TO THE SPECIFIC SAMPt. ES TESTED AND MAY NOT BE iNOICATIV~ O~ THE ENTIRE CONCRETE PLACEMENT.
REPORT'= MAY NOT BE REPRODUCED, EXCEPT IN FULL. W1THOUT W~ITTEN PERMIS'=ION BY PROFESSIONAL SERVICE IND~U~TRIES. INC.
Information lb BuiM On
PSI A-200-1 (2)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 ° Fax 214/333-2853