Loading...
Town Center L1B3-LR 980916 Information .To Build On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: September 16, 1998 OURREPORTNO.: 341-80053-38 ......... --. ............... i-'---~---'.'-~-L .... _ ........................ ~---- ' ._ "--2~ ....... _2L_-- -..' ' FIELD DATA: LOCATION OF PLACEMENT PAVING 30' SOUTH X 25' WEST OF SOUTI4EA~T CORNER OF PAD DATE PLACED September 09, 1998 SUPPLIER REDI-MIX TIME 07: 10 am DELIVERY TICKET NO./TRUCK NO. 11667 SLUMP, IN. 5 MIX NUMBER AND PROPORTIONS 732 AIR CONTENT. % 4.9 CEMENT - - - AIR TEMPERATURE. °F 80 WATER - - - CONCRETE TEMPERATURE, °F 89 FINE AGGREGATE - - - DATE RECEIVED IN LAB September 10, 1998 COARSE AGGREGATE --- FIELD DATA SUBMITTED BY PSI\FLOYD PALMER ADMIXTURE - - - MIX DATA SUBMI'I-FED BY REDI -MIX .N~_TE~A[PI~JCAB_L E ASTM STANDARDS.UN~_ _ ~_OTHERWI~C. JblDICATED SLUMP: C143-gl~..AI ~N'TENT: c:-='31 -gl b: T~TURE: C1 (~4-~6(g31: CAPPING: C1231-93 ............. _.. '~ . _._. COMPRESSION TEST RESULTS ASTM C39-94 LABORATORY i SPECIMEN TEST TOTAL CYLINDER CYLINDER , COMPRESSIVE IDENTIFICATION AGE DATE OF : LOAD DIAMETER AREA ! STRENGTH NUMBER OR SET NO. (DAYS) TEST [LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK 457 A 7 I 09/16/98 92000 6.00 28.27 3250 Cone 457 i B 28 10/07/98 : 457 iC 28 10/07/98 457 ' D H HOLD I SPECIFICATIONS - , 28 ! 3000 Cylinders pic~ad up by PSI Test results comply with applicable REMARKS: X_ Cylinders made by PSI representative. X__ mpresenlative. .__ specifications. Cylinders made by Architect's or Test results do not comply with __ Contractors representahvs. ._ Cylinders delivered to PSI laboratory. ._ a~olicable specifications. TECHNICIAN: FLOYD PALMER Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE Pf. ACEMENT. REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. wrrHOUT WRITTEN PERMtS~ION BY PROFESSIONAl. SERVICE INDUSTRIES. INC. PSI A-200-4 (4)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 21 4/263-2612 Information .To BuiM On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: September 16, 1998 OUR REPORT NO.: 341-80053-39 FIELD DATA: LOCATION OF PLACEMENT PAVING 40' SOOTH X 70' EAST OF SOUTI-IWRST CORNP..R OF [3AD DATE PLACED September 09, 1998 SUPPLIER REDI-MIX TIME 04:25 am DELIVERY TICKET NO./TRUCK NO. 11650 SLUMP, IN. 5 1/2 MIX NUMBERAND PROPORTIONS 732 AIR CONTENT, % 4.8 CEMENT - - - AIR TEMPERATURE, °F 7 9 WATER - - - CONCRETE TEMPERATURE, °F 8 7 FINE AGGREGATE DATE RECEIVED IN LAB September 10, 1998 COARSE AGGREGATE --- FIELD DATA SUBMITI'ED BY PSI\FLOYD PALMER ADMIXTURE MIX DATA SUBMITTED BY REDI-MIX COMPRESSION TEST RESULTS ASTM C39-94 , LABORATORY I SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE IDENTIFICATION AGE : DATE OF LOAD DIAMETER AREA STRENGTH / NUMBER ; OR SET NO. (DAYS) ~ TEST (LBS.) (IN.) (SQ. IN.) (PSI) ! TYPE OF BREAK 456 A 7 09/16/98 82000 6.00 28.27 2900 Cone 456 B 28 10/07/98 456 C 28 ; 10/07/98 456 D H HOLD SPECIFICATIONS 28 ' 3000 Cylindem picAed up by PSI Test results comply with applicable REMARKS: X Cylinders made by PSI representative. _X_ representative. ___ specifications. Cylinders made by Architect's m Test results do no~ comply with ___ Contracto['s representative, .._ Cylinders delivered to PSI leboralory. __ applicable specifications. TECHNICIAN: FLOYD PALMER Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORTS MAY NOT BE REPI~OOUCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMI~ION BY PROFESSIONAL ~RVtCE INDUSTRIES, INC. PSI A-200-4 (4)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612 Information .To Build On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 REVISION #1 DATE: September 16, 1998 OUR REPORT NO.: 341-80053-40 FIELD DATA: LOCATION OF PLACEMENT PAVING 30' SOUTH X 40' WEST OF SOUTHWEST CORNER OF PAD DATE PLACED September 09, 1998 SUPPLIER REDI-MIX TIME 03: 15 am DELIVERY TICKET NO./TRUCK NO. 11642 SLUMP, IN. 5 1/2 MIX NUMBER AND PROPORTIONS 732 AIR CONTENT, % 4.9 CEMENT - - - AIR TEMPERATURE, °F 7 9 WATER - - - CONCRETE TEMPERATURE, °F 86 FINE AGGREGATE - - - DATE RECEIVED IN LAB September 1 0, 1 9 9 8 COARSE AGGREGATE - - - FIELD DATA SUBMITTED BY PS I \ FLO~D PAZ. AVfER ADMIXTURE - - - MIX DATA SUBMII-FED BY REDI-MIX NOTE- APP'LIGAm F ASTM 8T~.UNLE88 OTHER_WISE INDICA'r~rt: SLUt4=: C 14 ~: ~0 s ;_AI[R_G~JZ?,~': C231,.91b: T E I/~ELRAI~RE;_C 1064:~_$);_G~:~IN G LC 1231_~9.1 COMPRESSION TEST RESULTS ASTM C39-94 I SPECIMEN TEST ' ; TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORYIIDENTIFICATIOI~ AGE DATE OF ~ LOAD DIAMETER AREA STRENGTH NUMBER OR SET NO. (DAYS) :. TEST (LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK 455 A 7 09/16/98 86000 5.99 28.18 3050 Cone 455 B 28 10/07/98 108000 6.00 28.27 3820 Cone 455 C 28 10/07/98 103000 6.00 28.27 3640 Cone 455 D H }{OLD SPECIFICATIONS ;; 28 3000 Cylind~ picked up by PSi Test resulls comply with epplicaMe REMARKS: X Cylindem made by PSi representative. X~ repmsenlative. X. specifications. Cylinders made by ArchiteCt's o~ Test results do not comply with __ Contractm's representative. __ Cylindom delivered to PSI Imboratmy. . ._ applicable specifications. TECHNICIAN: FLOYD PALMER Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULT8 APPCY OktY TO THE ~gEClFIC SAMPLES TESTED AND MAY NOT BE BdOICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORT8 MAY NOT BE REF~OOUCED. EXCEPT IN FULL. WITHOUT 1NRrrTEN PERMI881ON BY PROFEBEIONAL BERVICE INOUSTRIE$. INC. ,m ^.2oo-4 (4)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 * Phone 214/330-9211 · Fax 214/263-2612 Information .To Build On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 REVISION #1 DATE: September 16, 1998 OUR REPORT NO.: 341-80053-38 FIELD DATA: LOCATION OF PLACEMENT PAVING 30' SOUTH X 25' WEST OF SOUTI{EAST CORNER OF PAD DATE PLACED September 09, 1998 SUPPLIER REDI-MIX TIME 07: 10 am DELIVERY TICKET NO./TRUCK NO. 11667 SLUMP, IN. 5 MIX NUMBER AND PROPORTIONS 7 3 2 AIR CONTENT, % 4.9 CEMENT - - - AIR TEMPERATURE, °F 8 0 WATER - - - CONCRETE TEMPERATURE, °F 8 9 FINE AGGREGATE - - - DATE RECEIVED IN LAB September 10, 1998 COARSE AGGREGATE I I l FIELD DATA SUBMITFED BY PSI\FLO~D PA.T. JVlER ADMIXTURE - - - MIX DATA SUBMrFrED BY REDI -MIX IVzQ~E;.AJSO~TM ¢:TA]~I~%RDS.UNI FSS OTHERWISE INDICATED:. ~LtJt~': C143-90m: AIR CONTENT: C231-91b: TEMPERATtJ~F' C1{~4-88(9't): CAPPING: C123,1-93 COMPRESSION TEST RESULTS ASTM C39-94 SPECIMEN I TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY IDENTIFICATIONI AGE DATE OF LOAD DIAMETER AREA STRENGTH NUMBER OR SET NO. [(DAYS) TEST (LBS.) (IN.) (SQ. IN.) (PSI) 'P(PE OF BREAK 457 A ' 7 09/16/98 92000 6.00 28.27 3250 Cone 457 B i 28 10/07/98 114000 6.00 28.27 4030 Cone 457 C 28 10/07/98 111000 6.00 28.27 3930 Cone 457 D ' H HOLD SPECIFICATIONS L { 28 3000 Cylinders picked up by PSi Test mlultl comply with applicable REMARKS: X Cylinders mede by PSI m~entalive. __X {~ive. X__ Spllc~tions. Cylinders m~d~ by Architect'l or Tell relults do not comply wilh ._ Co~tracto~'l represerttative. __ Cylinders delivered to PSI laboratory. ._ applicable lpecificationl. TEC~INICIAlg: FLOYD PALMER Respectfully submitted, Professional Service Industries, Inc. THEME TEST RESULTS AI:I=t.Y OH.Y TO THE ~I'ECIFIC ~,AtII~LE8 TESTED ~ i/AY NOT BE IND~...ATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORT8 MAY NOT BE REPRODUCED, EXCEPT IN FULL. W1THOUT ',NRiTI--r.N PERMISSION BY PROFESSIONAL SERVICE INOU'ml'RIE$. I~l PSI A-200-4 (4)t: Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/3,30-9211 · Fax 214/263-2612 $]I Information .To Build On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 REVISION #1 DATE: September 16, 1998 OUR REPORT NO.: 341-80053-39 FIELD DATA: LOCATION OF PLACEMENT PAVING 40' SOUTH X 70' EAST OF SOUTHWEST CORNER OF PAD DATE PLACED September 09, 1998 SUPPLIER REDI-MIX TIME 0 4: 2 5 am DELIVERY TICKET NO./TRUCK NO. 1 16 5 0 SLUMP, IN. 5 1/2 MIX NUMBER AND PROPORTIONS 732 AIR CONTENT, % 4.8 CEMENT - - - AIR TEMPERATURE, °F 7 9 WATER - - - CONCRETE TEMPERATURE, °F 8 7 FINE AGGREGATE - - - DATE RECEIVED IN LAB September 10, 1998 COARSE AGGREGATE --- FIELD DATA SUBMITFED BY PS I \ FLOYD PALMER ADMIXTURE - - - MIX DATA SUBMITTED BY REDI -MIX COMPRESSION TEST RESULTS ASTM C39-94 SPECIMEN TEST TOTAL CYLINDER , CYLINDER COMPRESSIVE LABORATORY IOENTIFICA'nON AGE DATE OF LOAD DIAMETER . AREA ! STRENGTH · NUMBER OR 8ET NO. (DAYS) TEST (LBS.) (IN.) i (SQ. IN.) ! (PSI) i TYPE OF BREAK 456 A 7 09/16/98 82000 6.00 i 28.27. 2900 Cone 456 B 28 10/07/98 101000 6.00 28.27 ' 3570 Cone 456 C 28 10/07/98 102000 6.00 . 28.27 i 3610 Cone 456 D H HOLD _ SPECIFICATIONS , 28 ; 3000 Cylinders picked up by PSI Test result-, comply wilh applicable REMARKS: X__ Cylinders made by PSI representative. 7,, representMlve. ~ specifications. Cylinders made by Architect's or Test results do not comply with .__ Contractor's representative. __ Cylindms delivered to PS1 laboratory, applicable specificatiorts. TECHWICIAN: FLOYD PALMER Respectfully submitted, Professional Service Industries, Inc. .s, ^-~-4 <4); Professional Service Industries, Inc. * 4087 Shilling Way · Dallas, TX 75237 · Phone 214/'330-9211 · Fax 214/263-2612 . ]m, , lIInfonnation .To Build On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORG/YN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: Septen%ber 16, 1998 OUR REPORT NO.: 341-80053-40 FIELD DATA: LOCATION OF PLACEMENT PAVING 30' SOUTH X 40' WEST OF SOUTHWEST CORNER OF PAD DATE PLACED September 09, 1998 SUPPLIER REDI-MIX TIME 03:15 am DELIVERY TICKET NO./TRUCK NO. 11642 SLUMP, IN. 5 1/2 MIX NUMBERAND PROPORTIONS 732 AIR CONTENT, % 4.9 CEMENT - - - AIR TEMPERATURE, °F 79 WATER - - - CONCRETE TEMPERATURE, °F 86 FINE AGGRECN~TE - - - DATE RECEIVEDIN LAB September 10, 1998 COARSEAGGREGATE FIELD DATA SUBMITTED BY PSI\FLOYD PA/.JVlER ADMIXTURE - - - MIX DATA SUBMITTED BY REDI -MIX NOTE: APPLIC~BL[= ASTM 8TANDA_ RD~.UIMLE S ~_OT H E R_ W1;~;JNDJC..~; SLUMP: C 14L~.-~0~ CONTENT: C231-gtb: TElliPERATURF:' C10~4-66i'g3)~lNO: C1231 -g3 COMPRESSION TEST RESULTS ASTM C39-94 SPECIMEN TEST ' TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY IDENTIFICATIONAGE DATE OF LOAD DIAMETER AREA STRENGTH NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK 455 A 7 09/16/98 86000 5.99 28.18 3050 Cone 455 B 28 10/07/98 455 C ' 28 10/07/98 455 D H HOI~D SPECIFICATIONS :. 28 3000 : Cylinders picked up by PSI Test results comply with applicable REMARKS: _X_ Cylinders made by PSI representative. X_. representative. ___ specificatiortl. Cylinders mede by Archilect'$ o~ Test results do not comply with Co~Ntrectm's representative. Cylinders delivered lo PSI laboratory, applicable specifications. TECHNICIAN: FLOYD PAI~4ER Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT SE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPOFtT$ MAY NOT BE REPRODUCED, EXCEPT IN FULL. V~qTHOUT WRITTEN PERMISSION BY PROFESEIONAL SERVICE INDUSTRIES. INC. PSI A-200-4 (4)1= Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/'330-9211 · Fax 214/263-2612