DAILY FIELD REPORT
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
DALLAS, TX 75248
DATE: September 14, 1998 OUR REPORI NO.: 341-80053- 37
VVEATHER: LIGHT RAIN
IEMPERATURE RANGE: 72 TO: 85
INSPECTOR: FLOYD PALMER
TYPE OF INSPECTION BEING PERFORMED
__ SOILS X CONCRETE
__ FOUNDATIONS BATCH PLANT
__ CONTROLLED FILL (COMPACTION) __ PLACEMENT (JOB SITE)
X CYLINDER PICK-UP
ASPHALT OTHER
BATCH PLANT
PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, a representative of PSI picked up one set of four
concrete test cylinders cast on 9/11/98 and transported them to
our laboratory for curing and testing.
Respectfully submitted,
Professional Service Industries, Inc.