Loading...
Town Center L1B3-LR 980914 Information .To Build On DAILY FIELD REPORT TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: September 14, 1998 OUR REPORI NO.: 341-80053- 37 VVEATHER: LIGHT RAIN IEMPERATURE RANGE: 72 TO: 85 INSPECTOR: FLOYD PALMER TYPE OF INSPECTION BEING PERFORMED __ SOILS X CONCRETE __ FOUNDATIONS BATCH PLANT __ CONTROLLED FILL (COMPACTION) __ PLACEMENT (JOB SITE) X CYLINDER PICK-UP ASPHALT OTHER BATCH PLANT PLACEMENT (JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: On this date, a representative of PSI picked up one set of four concrete test cylinders cast on 9/11/98 and transported them to our laboratory for curing and testing. Respectfully submitted, Professional Service Industries, Inc. REPOT8 MAY NOT RE REPROOUCED. EXCEPT IN FULL. WITHOUT V~IITTEN PERMISSION BY PROFESSIONAl SERVICE INDUSTRIES. INC. ,,s, A-3,~-2 ¢,)r Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612