Town Center L4B1-CS001009 T H E: C I T Y O F'
COPPEL£
October 9, 2000
Ann Skeleton
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Drive, Suite 200
Plano, TX 75093
Town Center Addition, Lot 4, Block 1
Fee Assessment Letter
Dear Ms. Skeleton:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $17,775.00 and forward to
the Finance Department along with a copy of the Fee Assessment table. This amount is a
portion of the assessed fees that need to be paid prior to Council approval. Also provide a
copy of the Engineer's estimate or contract to our office so the construction inspection
fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sine rely, 7~
'~~.~M~P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Debbie Ingram, Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
255 PARKWAY * P.O BOX 478 * COPPELL TX 7§OI9 1Ir TEL 972/462 0022 ~ FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Town Center Addition, Lot 4, Block I
Date: lO/9/oo
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $10,575.00 $10,575.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $378.74
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,377.19
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $70.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $7,200.00 $7,200.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100 % due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
II
TOTAL $20,060.93
ITOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $17,775.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Town Center Addition, Lot 4, Block 1
DATE: 10/9/00
Water Impact Fee: ./
Domestic Meter(s): 2 - 2 inch = 16
Irrigation Meter(s): 1 -~i 1/2 inch = 5
0 = 0
Fireline Meter(s): 1 - 6 inch = 2.5
Total #: 23.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 2 Domestic Meter(s) @ $189.37
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total 0: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$137.81
$0.00
$1,239.38
Domestic Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
16
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$10,575.00
$200.00
$378.74
$137.81
$0.00
$1,239.38
$70.00
$60.00
$7,200.00
$100.00
$100.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
$0.00
$0.00
Roadway Impact Fee:
(See attached fee calculations)
$0.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Town Center Addition, Lot 4, Block 1
10/9/00
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Commercial
Land Use **
Shopping Center
15,300
Building Area (sO
Development Units ** 15.30
Vehicle Miles per Development Unit ** 4.77
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $21,894.30
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1982 Univest agreement this property can not be assessed for Denton Tap Rd.
& Sandy Lake Rd. Therefore no Roadway Impact Fee will be collected on this project.
~7~9319558
10/06/00 FRI 11:13 FAX 97293LR538 DOWDEY ANDERSON ASS~Z ~001
5225 Village Creek Drive Suite 200
Piano, Texas 75093
Phone' 972-931-0694
Fax.' 977.931-9538
To: Mike Martin - Engineering From: Ann Skeiton
Fax= 97Z.304.3570 Date: October 6, 2000
i~hg~ne: 972.304.3681 I~a~s: 1, plus cover
I~e: Town Center Addition, Lot 4, BIk I ¢¢: Kris $ilverthom. File
(Next to Wendy's)
DAP, Job #: 100-004
Per our conversation yesterday, please find the following information required to calculate the
Water Impact Fees for this development:
I ~ D.C.D.C. Valve for Fire Protection
I ~ 1-1/2" meter for Irrigation
2 - 2" meters for Domestic
I ~ Sanitary Sewer Connection
1 ~ 16" x 6" Tap
I - 8" x 8" Tap
Building Square Footage ~ 15, 300
//
Also attached is a copy of the Legal Description for your use.
Please call if you have any questions.
Thanks for your help,
Ann Skelton
10/06/00 FRI 11:13 FAX 9729319538 DOWDEY ANDERSON ASSOC ~002
OWNERS CERTIFICATE AND DEDICATION
STATE OF TEXAS §
COUNTY OF DALLAS §
WHEREAS, COPPELL / DTR, L.P., is the owner of a tract of land situated m the S.A. & M.G.R. tL
Survey, Abstract No. 1430 in the City of Coppel[, Dallas County, Texas and being part of a tract of land as
described in a deed from Good Financial Corporation to M. Douglas Alkins, Trustee, as recorded in Volume
76188, Page 2355 of the Deed Records of Dallas County, Texas and being more particularly described as
follows:
BEGENrNING at a 112" iron rod found for corner on the east line of Denton Tala Road (a variable width
fight-of-way), said point being the northwest comer of Lot 2 in Block 1 of Town Center Addition, an addition
to the City of Coppell as recorded ill Volume 95172, Page 4749 of the Deed Records of Dallas County, Texas;
THENCE N.01 °00'58"W., 314.68 feet along the said east line of Denton Tap Road to an "X" found cut
in concrete for corner, said point being the southwest comer of Lot 3 in Block 1 of Town Center Addition, an
addition to the City of CoppelI as recorded in Volume 95240, Page 4999 of thc Deed Records of Dallas County,
Texas;
TI-I~NCE N.88°59'02"E., 336.00 feet leaving the said east line of Denton Tap Road, and naming
along the south line of said Lot 3 in Block 1, to an "X" found cut in ¢orteret¢ for comer, said point being on the
west Line of Town Center Boulevard (a 28 foot wide right-of-way), said point also being in a non-tangent curve
to the right running in a southerly direction and having a central angle of 35°44'27'' a radius of 286.00 feet and
a chord bearing of S. 16°5 I'15"W.;
THENCE along said curve, and along the said west line of Town Center Boulevard, 178.41 fe~,t t~ the
end of said curve, a 1/2" iron rod found for comer, said point being the beginning ora curve to the leR having
a central angle of 29°I 1'42' a radius of 314.00 feet and a chord bearing of S.20°07'38"W.;
THENCE along said curve, and continuing along the said west line of Town Cent~' Boulevard, 160.00
feet to the end of said curve, a 1/2" iron rod found for comer, said point being the northeast comer of the said
Lot 2 in Block 1;
THENCE S.88°59'02"W, 225.05 feet leaving the said west line of Town Center Boulevard, and
nmning along the north line of said Lot 2 in Block 1 to the Point of Beginning and containing 2.057 acres
(89,616 square feet) of land.