Town Center L1B3-LR 980909 REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
DAJ~LAS, TX 75248
DATE: September 09, 1998 OUR REPORT NO.: 341-80053-35
--- -: -~YL ~-~2 ............................... _-.
FIELD DATA: Concrete was a 3000 psi mix delivered by REDI-MIX, mix number 732.
i NO. OF ' CONCRETE
= ' TEMPERATURE °F
SPECIMENS SUPPLIER i TIME TRUCK TIME TRUCK YARDS OF i ~ AIR ........
SE_T__N_O~_ __ ~M_~ .DE_ ....... T_ICKET NUMBER i DISPATCHED UNLOADED CONCRETE i SLUMP. INI CONTENT. % · AIR CONCRETE
455 4 11642 02:45 am 03:20 am 50.0 i 5 1/2 : 4.9 79 86
I
456 , 4 11650 03:40 am 04:30 am 110.0 i 5 1/2 4.8 I 79 87
457 ; 4 11667 05:55 am 07:15 am 230.0 5 4.9 i 80 89
: ! .
............ : .......... [ ...................
LOCATION: PAVING
455 I 30' SOUTH X 40' WEST OF SOUTHWEST CORNER OF PAD
456 ] 40' SOUTH X 70' EAST OF SOUTHWEST CORNER OF PAD
i 457 ! 30' SOUTH X 25' WEST OF SOUTHEAST CORNER OF PAD
NOTE: APPLICABLE ASTM STANDARDS. UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-91; SLUMP: C143-90s. AIR CONTENT: C231-91b; TEMPERATURE- C1064-86(93)
REMARKS: Observed the placement of 260.0 cubic yards of concrete.
TECHAIICIAN: FLOYD PALMER Respectfully submitted,
TIME: 01: 30 am Professional Service Industries, Inc.
THESE TEST RESUI. TS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF 11'1E ENTIRE CONCREI~ PLACENENT
Information To Build On
PSI.*~2OO-1 (2}F PSI · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/333-2853