Loading...
Town Center L1B3-LR 980902 Infonndtion .To BuiM On DAILY FIELD REPORT TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: September 02, 1998 OUR REPORT NO.: 341-80053-27 · WEATHER: CLEAR TEMPERATURE RANGE: 100 TO: - -- INSPECTOR: FRED MAYHALL TYPE OF INSPECTION BEING PERFORMED SOILS X CONCRETE FOUNDATIONS BATCH PLANT ~ CONTROLLED FILL (COMPACTION) ~ PLACEMENT (JOB SITE) X CYLINDER PICK-UP ASPHALT OTHER BATCH PLANT __ PLACEMENT (JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: On this date, a representative of PSI picked up three sets of four concrete test cylidners cast on 9/1/98 and transported them to our laboratory for curing and testing. Respectfully submitted, Professional Service Industries, Inc. REPORTS MAY NOT BE REPR(X)UCED. EXCEPT IN FULL· WITHOUT Vi~ITTEN PERMISSION [ay PROFE~,~IONAI. SERVICE IN{~TRIES. ~. PS, A-300-2 (1)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612