Loading...
Town Center L1B2-CS 980813MEMORANDUM To.' From: RE: Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works TGrraevgi~o~es, Chief Bui~tmlp. p, Firc, t~ia~hggfficial ~ D~¢truction Inspector WALK-THRU for Town Center Shopping Center Phase I Date: August 13, 1998 A walk-thru for paving and utilities on the referenced project has been scheduled for Thursday, August 20, 1998 at 8:30 a.m. If I can be of further assistance please let me know. cc: Dowdey, Anderson and Associates, Inc. Paul Johnson, Royal General Contractors Fax (972) 931-9538 Fax (972) 929-1929 filelldavislOwalklhmmm