Loading...
Town Center L1B3-LR 980827 Information .To Build On DAILY FIELD REPORT TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: August 27, 1998 OUR REPORT NO.: 341-80053-23 WEATHER: I-IOT TEMPERATURE RANGE: 9O TO: 100 INSPECTOR: PERRYN GIVENS TYPE OF INSPECTION BEING PERFORMED __ SOILS X CONCRETE FOUNDATIONS BATCH PLANT __ CONTROLLED FILL (COMPACTION) __ PLACEMENT (JOB SITE) X CYLINDER PICK-UP ASPHALT OTHER ; BATCH PLANT __ PLACEMENT (JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: On this date, a representative of PSI picked up two sets of four concrete test cylinders cast on 7/26/98 and transported them to our laboratory for curing and testing. Respectfully submitted, Professional Service Industries, Inc. REPORTS I~y NOT BE ~EPR(3OUCED. EXCEPT IN FULL. V~'I'I.~ V~II-I'EN PERMISSION BY P~$SlONAL SE.VICE If~DUSTI~I~S. INC. PSI A-300-2 (1)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 ° Fax 214/263-2612