Loading...
Town Center L1B3-LR 980824 Information .To Build On REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 REVISION #1 DATE: August 24, 1998 OUR REPORT NO.: 341-80053-21 ........ .. 3%----~ ....... ' ........................ - .. ' .... . ~ .............. ~'-'~: .... _--- .....~7 .................. FIELD DATA: LOCATION OF PLACEMENT GRADE BEAMS GP~DE BEAMS 1.0 AND 7.0 DATE PLACED August 17, 1998 SUPPLIER REDI-MIX TIME 02:00 pm DELIVERY TICKET NO./TRUCK NO. 51135 SLUMP, IN. 4 1/2 MIX NUMBER AND PROPORTIONS 718 AIR CONTENT, % - - - CEMENT 4.5 AIR TEMPERATURE, °F 9 8 WATER CONCRETE TEMPERATURE. °F 9 1 FINE AGGREGATE DATE RECEIVED IN LAB August 18, 1998 COARSE AGGREGATE - - - FIELD DATA SUBMITI'ED BY" PSI \JERRY RENFRO ADMIXTURE MIX DATA SUBMI'I-FED BY REDI -MIX COMPRESSION TEST RESULTS ASTM C39-94 { SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE i LABORATORY i IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH NUMBER · OR SETNO. (DAYS) TEST (LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK 368 A 7 08/24/98 75000 5.98 28.09 2670 i Cone 368 B 28 09/14/98 95000 6.00 28.27 3360 Cone 368 C 28 09/14/98 93000 6.00 28.27 3290 Cone 368 D H HOLD SPECIFICATIONS 28 3000 Cylinders picked up by PSI TSSI results comply with applicable REMARKS: X_ Cylinders made by PSI representative. _.,,~.__ represmllative, specifications. Cylinders made by Architect's or Test results do not comply wilh Contractm'$ representative. Cylinders delivered to PSI laboratory, applicable specifications TECHNICIAN: JERRY RENFRO Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULTS APPt. Y ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATI~/E OF THE ENTIRE CONCRETE Pt.ACEMENT. REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL, W1THOCIT %%i~ITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC. Ps, ^.=oo-4 (4)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612 Information I. To Build On REPORT OF coNCRETE COMPRESSION TEST TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: August 24, 1998 OURREPORTNO.: 341-80053-21 FIELD DATA: LOCATION OF PLACEMENT GRADE BEAMS GRADE BEAMS 1.0 AND 7.0 DATE PLACED August 17, 1998 SUPPLIER REDI-MIX TIME 02: 00 pm DELIVERYTICKETNO./TRUCKNO. 51135 SLUMP, IN. 4 1/2 MIX NUMBER AND PROPORTIONS 718 AIR CONTENT, % CEMENT 4.5 AIR TEMPERATURE, °F 9 8 WATER - - - CONCRETE TEMPERATURE, °F 91 FINE AGGREGATE - - - DATE RECEIVED IN LAB August 18, 1998 COARSE AGGREGATE - - - FIELD DATA SUBMll-rED BY PS I \JERRY RENFRO ADMIXTURE - - - MIX DATA SUBMII'rED BY REDI -MIX _NOTE: AP~.I.J~BLE ASTM ~,~.D~.UNLF S~ OTH _E __~ INDI~F-D: eL [.1~: C14S-I)0s: AIR CONTENT: C231-91 b: TEMPERATURE: C10~4-Mt93k CAP. JP!NG.' ~4L231 - 9_3 ........... COMPRESSION TEST RESULTS ASTM C39-94 ' LABORATORY ~ IDENTIFICATION~ AGE ' DATE OF LOAD ..... DIAMETER AREA STRENGTH _ NUMBER OR SET NO. (DAYS); TEST (LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK - 368 : A 7 08/24/98 75000 i 5.98 28.09 2670 Cone 368 28 09/ .4/98 368 C 28 09/14/98 368 I D }{ HOLD SPECIFICATIONS 28 3000 Cylinders picked up by PSI Test results comply wilh applicable Cylinders made by Archilect's or Test results do not comply with -- C~'¢rectofe rep~serttetive. Cylinders delivered fo PSI lebo~tor),. _. __ apfllicable specifications. TECHNICIAN: JERRY RENFRO Respectfully submitted, Professional Service Industries, Inc. THESE TEST RES%q. TS ~=Pt.Y ONLY TO THE SPECIFIC SANIPI.E$ TF-~TED AND MAY NOT ~E INOICATI%'E GF THE ENTIRE CONC.~ETE PLACEMENT. REPORT8 MAY NOT BE REPROOIJCED, EXCEPT IN FULL WITHOUT WRITTEN PERMIBEION BY PROFE$81ONAL SERVICE INO[~TR ES, INC. PSI A.200-4 (4)F Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/330-9211 · Fax 214/263-2612