Loading...
Town Center L1B2-CS 980218DOYX~/~'X-'Y, ANDERSON AND ASSOCl/-.~-S, INC. CIVIL ENGINEERS 5225 VILLAGE CREEK DRIVE SUITE 200 PLANO, TEXAS 75093 (972) 931-0694 FAX (972) 931-9538 February 18, 1998 Mr. Mike Martin P.E. Asst. City Engineer City of Coppell 255 Parkway Blvd. Coppell, Tx 75019 Town Center Addition Lot 1, Block 2 Dear Mike: Upon final ~'eview of the construction plan for phone one of the shopping center, I recommend that the following improvements be deferred until the construction of Sandy Lake Road. ITEM QUANTITY UNIT UNIT COST AMOUNT 8' Curb Inlet 1 EA. 1,800.00 $ 1,800.00 18" RCP 50 L.F. 22.00 1,100.00 5' Wide Sidewalk 1,575 S.F. 2.00 3,150.00 (315 L.F.) Remove Concrete Flume 1 L.S. 800.00 800.00 TOTAL ALL ITEMS $ 6,850.00 The developer realizes that Sandy Lake Road will be under construction this summer, beginning with utility relocations. The utility relocations will destroy the above referenced improvements. Please accept this proposal with the attached check in the amount of $6,850.00 to allow the City to install said improvements with Sandy Lake Road. If you have any questions, please contact Guillermo Juarez. William A. Anders , . .