Loading...
Town Center L1B3-LR 980731 Information .To Build On · ngdneerl~ · ~.:~u/~'~, · Tee41ng REPORT OF FIELD INSPECI~ON OF CONCRETE TESTED FOR: MIF~ MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DA/~LAS , TX 75248 DATE: July 31, 1998 OUR REPORTNO.: 341-80053-10 FIELD DATA: Concrete was a 3000 psi mix delivered by REDI-MIX, mix number 718. NO. OF CONCRETE TEMPERATURE, "F SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP. IN CONTENT, % AIR CONCRETE 308 4 19284__ 10:08 am 11:00 am 10.0 4 98 93 LOCATION: PIERS 308 PIERS D. 5-1.0, C-2.0, C-3, C-4, C-5, C-8, C-9, C-1, B-1,A. 1-1 NOTE: ~PLICABLE ~ STANDARD8, UNLESS O~ERWtSE INOICATED: MAKING TEST SPECIMENS: C31~1; SLUMP: C143-g0a; AIR CONTENT: C231~1b; TEMPERATURE: C1~4-86(93) REMARKS: Observed the placement of 30.0 cubic yards of concrete. ALSO, ATTACHED ARE DRILLED PIER INSPECTION REPORTS. TECI-INICIAN: JERRY RENFRO Respectfully subm~ed, TIME: 07:00 am - 04:00 pm ProfessionalServicelndustrles, lnc. Professional Service Industfias, Inc. · 4087 Shilling Way · Dallas, TX 75237 ° Phone 214/330-9211 · Fax 214/263-2612