Loading...
Town Center L1B3-LR 980730 Information .To Build On ~-,~,~ · ~.--.. ~ · ~ REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER LEE LEWIS CONSTRUCTION COPPEL, TX 16660 NORTH DALLAS PARKWAY DALLAS, TX 75248 DATE: July 30, 1998 OURREPORTNO.: 341-80053-9 FIELD DATA: Concrete was a 3000 psi mix delivered by PIONEER, mix number 9325. ! NO. OF CONCRETE TEMPERATURE, °F ' ; SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR SET NO. MADE TICKET HUMBER DISPATCHED UNLOADED CONCRETE SLUMP, IN COHTENT, % AIR I CONCRETE 302 4 717851 01:00 am --- 10.0 3 1/2 101 92 i LOCATION: PIERS 1E,2E,3E,4E,5E,8E, gE,iOE 302 PIERS ' NOTE: ~PLIC~LE AS~ STANDARDS, UNLESS O~ERIMSE INDICTED: MAKING TEST SPEC~ENS: C31~1; SLUMP: C14~90a; AIR C~TE~: C231~1b; TEMPERATURE: C1064~(~) REMARKS: Observed the placement of 20.0 cubic yards of concrete. ALSO, ATTACHEDARE DRILLED PIER INSPECTION REPORTS. TECHNICIAN: JERRY R~.NFRO Respectfully submitted, Professional Sen/ice Industries, Inc. ~ TEBT RESULT8 AP~.Y ONLY TO THE 8~ECIFIC 8AMPL.E8 TEffiT--r.r.D ANO MAY NOT BE IN~)~CATIV~ OF ~ ~ CONCRETE PLACEMENT. Professional Service Industries, Inc. · 4087 Shilling Way · Dallas, TX 75237 · Phone 214/3.30-9211 * Fax 214/263-2612