REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PARKWAY
DALLAS, TX 75248
DATE: July 30, 1998 OURREPORTNO.: 341-80053-9
FIELD DATA: Concrete was a 3000 psi mix delivered by PIONEER,
mix number 9325.
! NO. OF CONCRETE TEMPERATURE, °F '
; SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR
SET NO. MADE TICKET HUMBER DISPATCHED UNLOADED CONCRETE SLUMP, IN COHTENT, % AIR I CONCRETE
302 4 717851 01:00 am --- 10.0 3 1/2 101 92 i
LOCATION: PIERS 1E,2E,3E,4E,5E,8E, gE,iOE
302 PIERS '
NOTE: ~PLIC~LE AS~ STANDARDS, UNLESS O~ERIMSE INDICTED: MAKING TEST SPEC~ENS: C31~1; SLUMP: C14~90a; AIR C~TE~: C231~1b; TEMPERATURE: C1064~(~)
REMARKS: Observed the placement of 20.0 cubic yards of concrete.
ALSO, ATTACHEDARE DRILLED PIER INSPECTION REPORTS.
TECHNICIAN: JERRY R~.NFRO Respectfully submitted,
Professional Sen/ice Industries, Inc.
~ TEBT RESULT8 AP~.Y ONLY TO THE 8~ECIFIC 8AMPL.E8 TEffiT--r.r.D ANO MAY NOT BE IN~)~CATIV~ OF ~ ~ CONCRETE PLACEMENT.