DAILY FIELD REPORT
TESTED FOR: MIKE MORGAN PROJECT: COPPELL TOWN CENTER
LEE LEWIS CONSTRUCTION COPPEL, TX
16660 NORTH DALLAS PI~RKWAY
DALLAS, TX 75248
DATE: July 17, 1998 OUR REPORT NO.: 341-80053-1
WEATHER:
TEMPERATURE RANGE: 89 TO: 104
INSPECTOR: PERRYN GIVENS
TYPE OFINSPECTION BEING PERFORMED
X SOILS CONCRETE
FOUNDATIONS BATCH PLANT
__CONTROLLED FILL(COMPACTION) __PLACEMENT(JOB SITE)
X OBTAIN SOIL SAMPLES
ASPHALT OTHER
BATCH PLANT
__PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, a representative of PSI traveled to the site to
obtain two samples of the material proposed for use as fill on
the above referenced project. The samples were returned to the
laboratory for testing.
Respectfully submitted,
Professional Service Industries, Inc.