Loading...
Town Center L1B2-CS 970416The City With A Beautiful Future Bill Anderson, P.E. Dowdey, Anderson & Associates, Inc. 162~0 Dallas Pkwy. Dallas, TX 7~248 P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 16, 1997 Town Center Shopping Center, Lot 1, Block 2 Development Fee ~ent Dear Mr Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $26,325.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Director of Engineering & Public Works Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. ]'.~isure Services DEVELOPMENT FEE TABLE Project: Town Center Shopping Center, Lot 1, Block 2 Date: 4/16/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $15,525.00 $15,525.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $587.94 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,114.18 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $105.00 000% due at Issuance of Water Meter) Wastewater Impact Fee $10,800.00 $10,800.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $150.00 (100% due at Issuance of Buildin~ Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee N~! submittal of development contracts TOTAL $32,822.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $26,325.00 DEVELOPMENT FEE WORKSHEET PROJECT: Town Center Shopping Center, Lot 1, Block 2 DATE: 4/16/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 3 - 2 inch = 24 ESU's I - 2 inch = 8 ESU's = ESU's 2 - 8 inch -- 2.5 ESU's Total #: 34.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 3 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 $2,459.10 Water Meter Deposit Fee (Domestic): Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) $15,525.00 $300.00 $587.94 $195.98 $o.oo $4,918.20 $90.00 $105.00 Wastewater Impact Fee: Total Domestic Meters ESU' 24 @ $450.OOea. $10,800.00 Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 3 Domestic meters @ $50.00 ea. (100% due prior to issuance of building permit) 50.00 $150.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit {50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ 9350.00 / Lot Multi-family @ 9350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ 91285.00 / Lot Multi-family @ 91285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, 9292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A 90.00 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Town Center Shopping Center, Lot I, Block 2 4/16/97 ROADWAY IMPACT FEE: Service Area * Use ** 2 Commercial Buildinl Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x IVchie!e Miles ~er Development Unit) x (Fee Per Vehicle Mile) -- Shoppin~ Center 91,195 91.195 4.77 $300 $130,500.05 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore no Roadway Impact Fee will be collected for this Development.