Loading...
Town Center L1B3-CS 990126FILE MEMORANDUM To: Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building_Official Travis~ From: Larry~~struction Inspector RE: FINAL WALK-THRU Date: ~anuary 26, 1999 A final walk-thru for paving and utilities on the referenced project has been scheduled for Tuesday, February 2, 1999 at 2:00 p.m. If I can be of further assistance please let me know. cc: Matt Malouf, Malouf Interests, Inc. Fax: 214-219-4901 Mike Morgan, Lee Lewis Const. Fax: 972-818-0706 Pat Hall, Fire Line Fax: 972 ~.~.~-8356 Lee Stone, Building Inspections fil¢/l_davis/Owa]kth113, mm