Loading...
Town Center L1B2-CS 960919CITY OF COPPELL PLANNING DEPARTMI=~NT STAFF REPORT CASE: TOWN CENTER SHOPPING CENTER. LOT 1. BLOCK 2, FINAL PLAT P & Z HEARING DATE: September 19, 1996 C.C. HEARING DATE: October 8, 1996 LOCATION: On the east side of Denton Tap Road, adjoining the Overton Bank property SIZE OF AREA: 9.8809 acres CURRENT ZONING: TC Crown Center) REQUEST: Approval of a Final Plat to allow the development of a shopping center APPLICANT: Owner: Ewing Properties 16660 Dallas Pkwy ~1r2200 Dallas TX 75248 214-250-3236 Fax 214-248-6701 Representative: Dowdey Anderson & Assoc. 16250 Dallas Pkwy #100 Dallas TX 75248 214-931-0694 Fax 214-931-9538 HISTORY: The majority of the property has been zoned TC since 1982. A 1- acre portion was rezoned to TC and the Prelimary Plat was approved on July 9, 1996, with City Council retaining final plat approval authority. TRANSPORTATION: Sandy Lake Road is a two-lane asphalt road within a variable- width right-of-way (100' wide in front of the subject property), shown on the thoroughfared plan as a C4D four-lane divided collector street to be built within a 110'-wide right-of-way. Item # 13 SURROUNDING LAND USE & ZONING: North - South - East - West - Vacant, "TC" Town Center zoning Town Oaks Centre shopping center, "C" Commercial zoning Chaucer Estates residential subdivision,. "PD-SF-7" Planned Development zoning Vacant, "TC" Town Center zoning COMP~S1VE PLAN: The Comprehensive Plan shows the property as suitable for neighborhood retail uses. DISCUSSION: The Planning and Zoning Commission and City Council approved a Site Plan in connection with approval of the ordinance granting the TC District for a 1-acre portion of this property and in connection with approval of the preliminary plat. The final plat conforms with the approved preliminary plat and site plan. The staff Development Review Committee reviewed the final plat and landscape plans, and made several additional recommendations. The applicant has complied with the majority of those. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the Final Plat subject to compliance with Engineering Department comments and subject to correction of the signature block to reflect that City Council is the final approval authority. 1) Recommend approval of the Final Plat and Site Plan 2) Recommend disapproval of the Final Plat and Site Plan 3) Recommend modification of the Final Plat and Site Plan ATI"ACHMENTS: 1) Final Plat 2) Site Plan 3) Landscape Plan 4) Departmental Comments Item # 13