Loading...
ST9801-CS 990402COPPELL, TEXAS 75019 RO. Box 478 ~ Coppell, Texas 75019 972-462-0022 April 2, 1999 Steven Priddy, President Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Re: Coppell Road Project # ST 98-01 Dear Mr. Priddy: This letter is written concerning the award date for Coppell Road. The City had anticipated awarding the project no later than the April 13, 1999 City Council meeting, however, two items have recently surfaced which will delay the award of the project. 1) The acquisition of the Hght-of-way from the Callejo tract. While Mr. Callejo had originally indicated he would give a right-of-entry for the project to proceed, he has since retained an attorney to represent him in right-of-way acquisition proceedings. At this point I am unsure exactly what affect that will have on the timeline for award of the Coppell Road project. An opinion from our attorney concerning the Antiquities Code of Texas. The Antiquities Code is administered by the Texas Historical Commission and any project which has an area larger than 5 acres has to receive a permit prior to beginning work. My calculations indicate that slightly over six acres is associated with this project. The process for the permit requires an archaeological evaluation of the site. I have been in contact with an archeologist to perform the study and submit the application to the State. After the study is complete and submitted to the commission, the commission has thirty days to respond. To date I am unsure exac~y when the report will be submitted so it is difficult to determine when an actual award date will take place on Coppell Road. If you should have any questions please feel free to contact this office at your convenience. Sincerely, Director of Engineering/Public Works Alan Greet, Freese Nichols Jim Witt, City Manager Clay Phillips, Deputy City Manager ~le/ST98-01/edbelltr