Loading...
Town Center L1B3-CS 980717 Coppell. Texas 75019 972-462-0022 ~ /~~ The City With A Beaut' ul e~ P.O. BOX 478 COPPELL, TEXAS 75019 ( July 17, 1998 Matthew E. Malouf Malouf Interests, Inc. 3811 Turtle Creek Blvd., Suite 1800 Dallas, TX 75219 RE: Town Center Addition, Lot 1, Block 3 Development Fee Assessment Dear Mr. Malouf: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $7,875.00 and fora, ard to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of thi.~ project. We look forward to working with you on this project. If you have any questions, plea.se contact me. S' cer ly~/~/~ ~. Martin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Town Center Addition, Lot 1, Block 3 Date: 7/17/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,625.00 $5,625.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142.80 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,912.05 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/ag (100% due prior to Council Approval) Roadway Impact Fee $0.00 · $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $10,274.85 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,875.00 L,,:VELOPMENT FEE WORKSH,-:ET PROJECT: Town Center Addition, Lot 1, Block 3 DATE: 7/17/98 Water Impact Fee: Domestic Meter(s): I - 1 1/2 inch = 5 ESU's Irrigation Meter(s): I - 1 1/2 inch = 5 ESU's = ESU's Fireline Meter(s): I - 6 inch = 2.5 ESU's Total #: 12.5 ESU's @ $450.00 ea. $5,625.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $142.80 $142.80 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: I Irrigation Meter(s) @ $142.80 $142.80 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: I Fireline Meter(s) @ $1,769.25 $1,769.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 @ $450.00 ea. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 on. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 Dt:VELOPMENT FEE WORKSHI=ET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 ! Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: N~.~d submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROAoWAY IMPACT FEE CALCULA I'IONS PROJECT: Town Center Addition, Lot L Block $ DATE: 7/17/98 ROAI~WAY IMPACT FEE: Service Area * 2 Category ** Commercial Land Use ** Shopping Center Building Size (Sq. Ft.) 24,620 Development Units ** 24.62 Vehicle Miles per Development Unit ** 4.77 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $35,231.22 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) As par the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd.. Therefore no Roadway Impact Fee will be collected on this project