Loading...
Town Center L1B3-CS 970807 DEVELOPMENT REVIEW COMMIITEE ENGINEERING COMMENTS ITEM: Tm Ctttt~ Atltli~ Lot 1. I~ioek 3. Preliminary Plat ~ S~e ~, ~ ~w t~ ~e~p~ of a ~, 620 s~ f~t ~ f~ on a 2.~ ~ ~ of p~ ~ ~ the ~he~ com~ of ~n T~ ~ ~ Town Ce~ ~~, ~ the m~e~ of ~w~, ~on ~ ~s~es, I~. DRC DA~: J~ ~1, 1~7 ~ ~ 7, 1997 CO.ACT: M~ M~, P.E., ~~ ~ En~eer 0~3679) PRELIMINARY RE VISED AFTER P-&Z Preliminary Plat 1. The contour lines need to be removed from plat. Site Plan 1. Provide a 4' sidewalk along Town Center Blvd. 2. Provide A.D.A. ramps at all driveways. Utility Plans 1. Show location of water meters, vaults, and fire hydrants. Meters and vaults need to be located in an easement. Landscaping Plans 1. Show visibility triangles at all ingress and egress locations. 2. Provide a 5' sidewalk along Denton Tap Rd. and a 4' sidewalk along Town Center Blvd. 3. Show 8' wide brick paver band for driveway adjacent to Denton Tap Rd.