Loading...
Town Center L1B2-CS 960618Date: Project: CITY OF COPPELL DEVELOPMENT FEES June 18, 1996 Town Center Shopping Center, Block 2, Lot 1 DRAF'I' Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Water Meter) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) (100% due at Issuance of Water Meters) Irrigation Meter Deposit (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * (100% due prior to Acceptance of Project) Roadway Impact Fee (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) (2 % of project cost due for private improvements) (4 % of project cost due for public improvements) TOTAL TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL TOTAL FEES DUE 16,425.00 250.00 10,800.00 150.00 50.00 587.94 2,850.76 16,425.00 -0- 10,800.00 -0- -0- information not available 70.00 -0- -0- -0- -0- 130,170.92 need submittalof contracts 130,170.92 -0- $157,395.92 $161,444.62 This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPP~nr. ENGINEERING HE~ORANDU~ DRAFT June 18.1996 Mike Martin, Assistant City Engineer Matt M. Cast, Superintendent of Public Services Development Fees for Town Center Shopping Center Block 2, Lot 1 The following fees referenced project. Water Impact Fee: 3 _ 2" Total 36.5 100% due prior to should be assessed and collected on the above Domestic Meter/s = 24 ESU's Irrigation Meter/s = 10 ESU's Fireline Heter/s = 2.5 ESU's ESU's @ $450.00 ea = Council approval of the final plat. Wastewater Impact 3. _ 2" Domestic Meter/s = 24 ESU's Total 24 ESU's ~ $450.00 ea = $10,800.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 5 Connections @ $50.00 each = $ ~50.0o 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 3 Connections 0 $50.00 each = $.=_150.00 100% due prior to issuance of buildlngpermit. (Residential only) DeVelopment Fees Page 2 Utility Final Inspection Fee (Ail DevelopEent) I lots ~ $ 50.O0/lot = $ 50.00 100% due prior to issuance of building permit. Water meter Fee (Domestic) 3 - 2" Domestic meters 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Heter Fee (Irrtgatton/Fireline) 2 _ 1 112" Irrigation meter/s ~ $.134.93 ea -- $269.86 I - 8" Fireline meter/s ~ $ $2,580.90ea = $2,580%90 Total $_~2,8_5.0: 76 100% due prior to issuance of water meter/s. Water meter Deposit (multi-Family or Non-Residential) 3 meters ~ $30.00 ea ~ $.90.00 100% due prior to issuance of water meters. Irrigation meter Deposit 2 meters ~ $$5.00 ea = $ ?0.00 100% due prior to issuance of water meters. ROA~ ~AY IMPACT FEE CALCULA'I,ONS PROJECT: DATE: Town Center Shopping Center, Lot 1, Block 2 6/18/96 ROADWAY IMPACT FEE: Area * T ~nd Use ** Ft.) Unit~ ** Miles per Development Unit ** Vehicle Mile Impact Fee due -- (Development Units) x Miles Vehicle Mile) 2 Commercial Shoppin[~ Center 90,965 90.965 4.77 $3OO $130,170.92 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)