Loading...
Townhouses-ES010115 co y~v~ '-, ENCROAC~ENT ON EASE~NT J~ 15, 2001 ~. M~e M~in CiW of Coppell P. O. Box 478 255 P~kway Blvd. Coppell, Texas 75019 Re: Ligge~-Payne 138 kV E-107398 NW C~ollton-Hackbe~ 345 kV Line E-138266 Dear Mr. Martin: The City of Coppell (hereinafter referred to as User) has requested permission to construct a storm sewer line within the area or boundaries of TXU Electric Company's (TXU Electric), successor toTexas Power & Light Company, easements recorded in Volume 3887, Page 110, and Volume 85077, Page 3300, Deed Records of Dallas County, Texas. TXU Electric is agreeable to the construction of the storm sewer line, hereinafter referred to as the "encroaching facility", if the encroaching facility is located and described as shown on the attached drawing, marked EXHIBIT "A" and incorporated herein, and subject to the following terms and conditions: It is understood and agreed that TXU Electric holds easement rights on the property involved; therefore, User will be required to obtain whatever rights and permission, other than TXU Electric's, that are necessary. This letter agreement shall extend to and be binding upon User and its successors, and assigns, and is not to be interpreted as a waiver of any rights held by TXU Electric under its easement. 2. User agrees to defend, to the extent allowable by law, indemnify and hold TXU Electric, its officers, directors, agents, and employees harmless against any and all claims, lawsuits, judgements, costs, and expenses for personal injury (including death), property damage or other harm for which recovery, of damages is sought, suffered by any person or persons that may arise out of or be occasioned by any negligent act or omission of User in performing the work referred to above, its officers, agents, associates, employees, or subconsultants; except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the sole negligence of TXU Electric, its officers, agents, or employees or separate contractors, and in the event of joint and concurrent negligence of both the User and TXU Electric, responsibility and indemnity., if any, shall be apportioned comparatively in accordance with the laws of the State of Texas, without, however, waiving any governmental immunity or other defenses available to the parties under Texas laxv. The provisions of this paragraph are solely for the benefit of the parties hereto and not intended to create or grant any rights, contractual or otherwise, to any other person or entity. 3. Use of draglines or other boom-type equipment in connection with any work to be performed on the TXU Electric easement by User, its employees, agents, representatives or contractors must comply with Texas Statute (3TexCiv. St. 1436c), the National Electrical Safety Code and any other applicable safety or clearance requirements. Notwithstanding anything to the contrary herein, in no event shall any equipment be within fifteen feet of the TXU Electric power lines situated on the aforesaid property,. User must notify TXU Electric's Supervisor of Dallas Region Transmission, at 972-721-6321 at least 48 hours prior to the start of any work on the TXTI Electric easement. 4. It is expressly understood and agreed that if the property has transmission or distribution facilities located thereon, User shall not place upon the premises, any improvements including but not limited to, buildings, light standards, fences, shrubs, trees or signs unless approved in writing by TXU Electric. 5. It is agreed that no trash dumpsters, toxic substances or flammable material will be allowed on the easement. 6. TXU Electric will not be responsible for any costs of construction, operation and maintenance of User's encroaching facility. It is further agreed that TXU Electric shall not be liable for any damage to the encroaching facility herein agreed to as a result of TXU Electric's use pursuant to its easement. Any TXU Electric property, damaged or destroyed by User or its agents shall be repaired or replaced by TXU Electric at User's expense and payment is due upon User's receipt of an invoice from TXU Electric. 7. General construction limitations on encroachments are described and listed in EXHIBIT "B", attached hereto and by reference made a part hereof. If the foregoing terms and conditions are acceptable to the City of Coppell, please have the original of this letter agreement signed and returned to me % TXU Services, P. O. Box 139083, Dallas, Texas 75313-9083, within 30 days for final approval by TXU Electric. Sincerely, Sr. Right of Way Agent ACCEPTED: APPROVED: CITY OF COPPELL TXU ELECTRIC COMPANY By: B "~ "' Title:'~" c'7~,~/~~'' Larry Garner t Manager of Dallas Region Transmission Date CGIT/ENC/200194 STATE OF TEXAS COUNTY OF DALLAS § T~i~lectr~.~n~v2 ~know~ledged before me on._ //~q .~_, 2001, by Lan3, Garner of p y, a texas corporation, a Iexas corlforation, on behalf of said corporation. ', MY COMMISSION EXPIRES, -- an or the State of Texas STATE OF TEXAS § COUNTY OF DALLAS § This...~\~rxinsU'umentb3 ~-~'~'was acknowledged, ?nei~lf~s~s~cO° ~/t~ ~d3coa,e~ , 2001,ofthebY City of Coppell, a municipal corporation, ' ~:~ration. o axy Public in and for the State of Texas CGIT/ENC/200194 EXHIBIT "B" CONSTRUCTION LIMITATION ON TU ELECTRIC COMPANY RIGHT OF WAY Equipment will not exceed 15 feet in height when operated under the line Draglines will not be used under the line or on TXU Electric fight of way Right of way will be protected from washing and erosion by method approved by TXU Electric No obstruction shall be installed on the right of way that would interfere with access to TXU Electric structure or prevent mechanical maintenance Blasting is not to be permitted on the right of way Any change in alignment or elevation should be reviewed by TXU for approval Equipment and materials will not be stored on fight of way during construction without written approval of the Supervisor of Regional Transmission No dumpsters on the fight of way No lighting structures or signs will be allowed within the fight of way The existing grade shall not be disturbed, excavated or filled within 15' of the nearest edge of any tower No fences over 8' tall and must be grounded every 10', if metal TXU will not permit any habitable structure, such as buildings, garages, sheds, guard houses, etc. within any portion of the right of way CGITfENC/200194