MEMORANDUM '"' XC G ''[' '
FROM: Dannie.R. Cummings, P.E. . . ' '" ~~' ' ' '
DATE:. December 5, .1991
RE: Thompson Tract, Belt Line Road and Ledbetter Dr~
This memorandum is. in response to Mr'. Gary Hendricks' traffic
concerns regarding the proposed Thompson Tract development.
His first concern was. the impact of this 'site on traffic
operatioms at Belt Line and MacArthur. During the 5-6 PM Peak .
hour, approximately 60 vehicles will enter the intersection as a
result of traffic -generated by the site-. 24 will be westbound
Vehicles an 36 will be eastbound. These volumes are minor and
will have a negl%gible effect on the traffic operations at Belt
Line and MacArthur.
The second.concern was the impact on traffic movements on Belt
Line when train activity disrupts traffic into .the site. A train
of approximately two minutes in duration will create a two
vehicle queue, in the eastbound left turning %raffic and a four
vehicle queue in the westbound right turning 'traffic. Since
approximately two vehicles will be able.to store in the driveway
between the railroad and Belt Line, such a queue on Belt Line
will'be two vehicles in length.
· Mr. Hendricks' final, concerm was in reference to the railroad's
right of. way and how this af.[ected the construction of
improvements on the. Belt Line fronbage. This is still a'
questionable and uncertain area because DART is the current owner
of the trackage. and because of the probable difficulty 'in
obtaining right of way.
Attached'to this memorandum are six pieces of information for
your use:
1. 24-hour machine counts on Belt Line
2. ~isting PM peak hour counts at Belt Line and Ledbetter
3. Existing PM-peak hour counts at Belt Line and MacArthur
4. Proposed-PM peak hour volumes at.Belt Line-and Ledbetter'
5. ProPosed PM peak hour volumes at Belt Line and MacArthur
6. Table of traffic generation characteristics at the
proposed site
Gerald L. Brickell, RE; · F. dvimn:l J. Mulcahy, RE. · Brian G. Lamon., RE. ? Dannie R. Cummings, RE. · James V. Dickinson, RE.
. Frederick D. Schmidt, RE. * Thomas G. Swenm)n, RE. · Timothy A. Chalupnik, RE. · Charles C. Rowlett, RE. · Ronald D. Seaman, RE.
Hereert ~. Jo~on, P.E. (~
Kansas City, Missouri · Des Moines, Iowa · Dallas;Texas · Olathe, Kansas · 'Minneapolis, Minnesota
Dodge City, Kansas · Liberal, Kansas
24-HOUR MACHINE CO~,~iTS
METROCOUNT DATE:
LOCATION: ~:~..l-{- L.~'n~ ~ ~:~r.J~.'i"~c 24-HOUR
VOLUME /~
~ e T~E END~G
12:15 AM ~ 5-- ~ 8:15 ~.~[ ?~ 4:15
12~0 I 0 ~ ~ 8:30 ~ I ~ ~ 4:30 ~'~-
1~45 ~ ~ 8:45 ~ ~ 7~ 4:45
1~0 0 ~ 9~ I ~ ~ 7~ 5~0 7~
1:15 I ~ 9:16 IC.2 ~-~ 5:15
1:30 I .~ 9~0 7 I ~E 5:30
~:4S A ~ e:45 7 7 ~/ 5:45
2~ O 3 10~0 ~ .~.~ 6:00
2:~S O ~ ~0:~5 HG ~ 6:~5 I1~
2~o 3 ~ 10:~0 ~ ~ 6:30
2:45 0 ~ 10:45 ~/ ~ 6:46
3:00 0 ~ 11:00 ~ 5-~ 7~0
3:16 O ~ 11:16 ~ ~-~ 7:15
~:~o ~ 0 11 :co ~ ~ 7:30 ~
3:46 ~ ~ 11:46 ~ I ~ 7:45 .3~
4~0 ~ ~ N~n ~ 7 7 8:00
4:16 0 A 12:16 PM 7 / q ~ 8:16 33
4:30 I _~ 12:30 g~ ( ~' I 8:30
4M5 ~ ~ 12:45 7 C' ~ ~ 8:45
6:15 1 I ~ 1:15 ~ ? .5~- 9:15 I
5:80 ~ ~ 1:30 ~ ~ 7~ 9:30 /
6:46 I~ 1~ 1:46 ~3 ~ 9:4S ,~
6:00 3~ 30 2~0 ~ ~, 10~ ,~,~
6:16 3 ~ I ~ 2:16 7~ 5~ I 10:16 ~
e:~o 7~ ~ ? , 2:30 5~ g;.~ lO:3O /
6:46 ~ 30 2:46 3'1 70 10:45
T:O0 A 0 ~ 3 ~ 3:00 e.3- 9 ~; 11:00 1
7:15 3iG ~3 11:16
T:~o 3~ ~ 11:30
7:45 ~ ~O ~ 11:45 I
8~0 ~ q I E ~ Midnight ~
From ~:00 (P.M.)
To ~ ;c)~ (P.M.)
~0', & INDICATE NO~TH
. '~. . ...... ,
STREET
From ~ (RM.)
Tm ~; ~ {P.M.}
Doy of Wlek ~
~/~/~
/
Date ~ INDI~TE
N~H
,0
STREET
From S:oo (P.M.)
To ~:Oo (p...)
Day of W.~k --
Dale ~ INOICATE NORTH
(A.K) A
From (P.M.)
To (P.M.)
Day of W**k ~
Date ~ INDICATE NORTH
IO&O
STREET
t
JBM JO. ION, .ICKF. LL.
Ceme#b~
TRIP GENERATION SUMMARY
THOMPSON TRACT
COPPE~ ~ TEXAS
AM Peak PM Peak
I~~ ~ :~ ~..~;'~::*=;:~.-: ~.~ ::~:.:..~:>:~. ::. ~: ~>.: ~. ~..~:~ ~::::::..:~.>.::~ ~.:::::~ ~:~:~.: ::~.:.~::::;,: ~. ....................... ~::::: ~>,:.<.:;~:: ::~;-:~: ~:.
Athletic Field/Park 91 - - - 13 9 22
Restaurant 1500 - - - 128 22 150
Storage 26 1 1 2 2 1
Total 1617 I I 2 143 32 1' 75
Alhtetic Field/Park 91 - - - 13 9 22
Office 225 22 3 25 4 23 27
Restaurant 1500 - - - 128 22 150
Storage 3 - - - 1 - 1
Total 1819 22 3 25 146 54 200
[~~.~.'-~:~:;: ~. :-. :::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
Athle~c Field/Park 262 - - - 38 25 63
Office 225 22 3 25 4 23 27
Restaurant 1500 - - - 128 22 150.
Storage 3 - - - I - 1
Total 1990 22 3 25 171 70 241
Phase I - current proposed land utilization ~)A-/"~.'
Phase II - future land utilization
Phase III - future land utilization scenario
Se/vD Our-