Loading...
Thompson, Johnny-CS 880930 P.O. Box 478 Coppell. Texas 75019 September 30, 1988 Johnny Thompson P.O. Box 11036 Carrollton, Texas 75011 Dear Mr. Thompson: At your request, I have prepared a list of items that must be completed in order for you to finish the work on the single family dwelling that you have moved onto your p~operty described as Tract 3 of Abstract 1493. The items you must complete are: 1. Obtain a zoning change for the property from Light Industrial to Residential -- or obtain a variance to erect a residential dwelling on a property that is zoned Light Industrial (it may be possible to obtain a variance during the plat approval process). 2. Seek and obtain plat approval of the property. Contact Taryon Bowman at 462-0022 for information concerning platting requirements. 3. Apply for a building permit after receiving approval of the plat. You will need to supply information concerning the portion of the building foundation that was constructed without a permit or any inspections. There are several options available to resolve the problem with the foundation. Once you have received a building permit, you will be able to complete the construction of the house. If you have any questions, feel free to call me at 462-9010. Sincerely, 9uilding Official cc: Alan D. Ratliff, City Manager Taryon Bowman, Planning and Zoning Coordinator