Loading...
Town Center L1B2-LR 980731· GEOTECHNICAL ENGINEERING E ° ENVIRONMENTAL CONSULTING GEE Consultants, Inc. · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: July 31, 1998 Date Concrete Placed: July 23, 1998 Client: Ewing Properties ~rojeet: Town Center Shopping Coppell, Texas Tri Cities Foundation Redi-Mix #10 Sidewalk Contr~tor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 24 Project No.: 298-0165 MATERIALS s~ sso a~. ~,.. INSPECTION DATA l~scril~ion (LIn/CuYd) Mix Number: 953 Time Sample Bamhed: 11:30 am Cemeut: Time Sampled: 12:15 pm Sample Location: Sidewalk from C-E 15'x60' Fly Ash: TmckYTicket No: 1271104509 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 98°F Concrete Range: 95°F Fine Aggregate: Slump Range (inches): 5 'A" Admixtu~s: Weather Conditions: Clear 1 Time Started: 11:00 am 2 Time Completed: 01:00 pm Added Water: 10 Gallons Sample Air Contem (%): 4,~ % ToUtl Cubic Yards Placed: 20 Required Su~ngth (Lbs./sq.in.): 3,000 Spo:imm Mmt.munM Age Da~ Total Load ~ive Str~-nt~h Remarks N~ SI~ (in.) (~y~) T~ (~.) (L~.I~.I~) GTC 98 7 07/30/98 80,180 2,840 CTC 99 28 08/20/98 5~A,, ~C 1~ 28 08/20/98 ~C 101 H HOLD T~ M~ u~ F~ ~ Cyl~ M~e By: AS ~ ~31,~,C-143 (U~ N~ ~i~) Remarks and/or Disu/bufion: * Superintendent informed of slump c.c: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) our prior wri~fl ~q~ovai. Our lectors and repom ~l~ly only to ~h~ smnple ~ested and/or im~m~d ~d m mi u~ly mdte~iv~ of gae qumUUes of q~ idmfic~ or smul~' products.